Title Page
-
Assad is a Slab
QA/QC Coordinator -
Conducted on
-
Subcontractor
-
Location
Slab, Before the Pour
Slab & Balconies
-
Control Lines
-
CMU sleeves marked
-
Depressions Marked & Formed
-
Railing Inserts Marked
-
Glass Fasteners Marked
-
Stud-Rails Marked and Placed
-
-
Edge Forms Complete
-
Edge Chamfers in Place
-
Balcony Drop Chamfer
-
Openings & Chases
-
Railing Inserts & Rebar Placed
-
Depression Forms
-
Rebar Clearance
-
Cable Counts & Chairs Done<br>
-
Cables have no Reverse Profile
-
PT Pocket Formers in place
-
Back-Up Bars in Place
-
Cables Clearance with Forms
-
Cables Clearance with Sleeves
-
Cables Clearance with Conduits
-
Cables Clearance at Depression
-
Deck is painted for Cables
-
Deck/Forms are cleaned with no debris
-
Stairs Layout & Forms are ready
Balconies/Stairs
-
Rebar Clearance
-
Cables Clearance
-
Stud-Rails Clearance
-
Balcony Railing Inserts
-
Rebar for Balcony Railing Inserts
-
Back-Up Bars
-
Rebar behind Railing Inserts
-
Edge Chamfers in place
-
Drip Chamfers in place
-
Check the Slope
-
Are Ironworkers & MEP present?
-
Deck/Edge Forms cleaned with no debris
-
Stairs Concrete Mix is correct
Slab, During the Pour
-
Concrete PSI, Batch Time & Slump
-
Cables profile remains unchanged
-
Rebar location not changed
-
-
Cable & Rebar Clearance at Depressions
-
Stud-Rails Clearance at Depressions
-
Laser/Pipe Screeding is used properly for flatness
-
Vibration at slab
-
Vibration at Column Dowels & Stud-Rails
-
Vibration at the Slab Edges
-
Vibration at Balcony Edges
-
Vibration at Beams
-
Controlling the underside of the deck for levelness
-
Balcony & Stairs broom finish
Verticals
-
Control Lines
-
Layout
-
Clearance of Rebar at bottom
-
Column forms are Plumb & Secure
-
Clearance of Rebar at the Top
-
Shear-Wall Forms are Plumb and Secure
-
Concrete Batch Time & Slump
-
Concrete is poured in layers
-
Vibration in Layers