Title Page
-
Conducted on.
-
Conducted by.
-
Project Name.
-
Created by Plaza Southeast Safety Team
General Requirements
-
PreTask received from subs
-
Orientation sticker visible on hard hat
-
Toolbox talks received from subs.
-
Competent person identified per trade.<br>
-
First Aid Kit Available Per Subcontractor
-
OSHA 10 received from subcontractor.
Fire Protection
-
Fire Extinguishers provided at each stairwell and signage.<br>
-
Standpipe operational.<br>
-
Standpipe connections protected from accidental struck by incidents.<br>
-
Is FDC connection accessible with signage showing its location?<br><br>
-
All combustibles removed from storage areas.
-
Hot work permit received and signed.
-
Fire Extinguisher at each hot work location.
-
Compressed gas gauges operational.
-
Oxy-Acetylene hoses in proper working condition.
-
Compressed gases stored upright, secured, valve closed or capped, and properly stored.
-
Welding leads are spliced with proper plugs, grounded, and in good condition
-
"No Smoking" signs posted at storage areas.
-
Exit signs posted.
-
Exit staircases accessible and free from debris.
-
Evacuation Plan posted
Personal Protective Equipment
-
100% Head protection provided.
-
Face shields as necessary.
-
Gloves as necessary.
-
Proper eye protection provided.
-
High-visibility clothing worn by all workers and staff on the job site.
-
Proper footwear provided.
-
Respiratory protection provided as required.
Environmental Controls
-
Restrooms Available. (working deck, every other floor, and ground floor)
-
Drinking Water Available per Subcontractor.
-
Dust Control
-
Lunch Area with trash containers cleaned regularly.
-
Mosquito/Pest Control as necessary.
-
Skip pans/Trash bins available for trash disposal.
-
Storm water prevention in place? (Silt fence, storm drains, socks, filter fabrics)
-
Control of any spilled hazardous material (oils, diesel, etc.).
Material Handling/Storage
-
Are all materials, ladders, tools, etc., within 6 feet of the edge tethered and/or tied off?
-
Material stored 6 feet from shaft openings.
-
Materials and Equipment 2 feet away from edge of excavation/trench.
-
Material stored clear of access routes.
-
Materials stacked or secured to prevent tipping.
-
Materials in the laydown yard organized and providing a clear access route through yard.
Rigging
-
All riggers and signal persons have proof of certification.
-
All loads flown with tag line(s).
-
All rigging equipment provided with rated load capacity and identification tags.
-
Outrigger platforms free of debris and chain in place.
Ladders
-
Podium ladders in use.
-
Ladder being used correctly.
-
Extension Ladder - Cleets intact, Secured.
-
Ladder decals legible.
-
Access/Egress - 2 per working deck.
Vehicles & Traffic on Job site
-
Spotters as needed.
-
Back up alarms functioning.
-
MOT Signage in place as per MOT plan.
Tools
-
Power tools provided with proper guarding.<br>
-
Power tools provided with HEPA Vacuum or other Engineering Controls.
-
Powder actuated tool training certificate available for operator.
Scaffolds/Shoring
-
Scaffolds properly braced to prevent tipping.
-
Mud sills/Base Plates/Casters in Place under each leg
-
Cross brace provided at each frame
-
Cross brace lock devices intact.
-
Proper access provided to each platform.
-
Each platform fully decked.
-
Each shoring scaffold properly decked.
-
Scaffold tag in use.
-
Debris netting provided when falling object hazard exists.
Fall Prevention
-
Fall Protection provided at all areas with a fall exposure of 6 feet or more.
-
Workers properly tied off.
-
Lanyards prevent contact with lower level.
-
Personal Fall Arrest anchors rated for 5000 lbs per worker.
-
Lanyard provided limits free fall distance to 6 feet.
-
Harness & Lanyard Inspection Form submitted.
-
Standard guard rails with handrail, midrail, and toeboard installed.
-
Safety Mesh covering railings.
-
Stairwells with proper railings.
-
Hole covers secured to prevent accidental displacement and marked.
-
Drop and outrigger nets free of debris.
-
Controlled Access Zone (CAZ) setup as necessary.
-
Aerial/Scissor Lift Green Tagged.
-
Aerial/Scissor Lift Operator provided certification.
-
Operator wearing fall protection and tied off.
Mobile Cranes
-
Firm ground conditions.
-
Outrigger pads in place and proper dimension and construction.
-
Swing radius protected.
-
Crane Inspections Available.
-
Crane Operator certification available.
Tower Cranes
-
Access to crane enclosure locked.
-
Crane bases clear of debris and water.
-
Electrical panel elevated out of water and locked out.
-
Crossover access deck adequate and safely banded back to slab.
Electrical
-
All electrical panels locked and labeled.
-
Lock Out/Tag Out in place as needed.
-
Properly installed temporary outlets protected by GFCIs.
-
All extension cords without damage and have ground pins.
-
Extension cords properly plugged into GFCI and out of the way.
-
All common areas well illuminated.
-
Properly installed and maintained lighting suspended under ceiling and grounded.
Excavation
-
Utilities located.
-
Excavation Permit received.
-
Support of excavation methods in place, i.e. Benching, shoring, trench box.
-
Proper access/egress provided as necessary.
-
Proper fall protection provided as necessary.
Equipment
-
All operators trained for the use of the equipment with proof of certification.
-
All tires properly inflated.
-
All windows in place surrounding cabin.
-
Operator's manual available.
-
All operator seats provided with seat belt.
-
Fire Extinguisher available on machinery.
Swing Stages
-
Installation and Daily Inspection reports received.
-
Competent Person Identified.
-
Swing covered in mesh and identified.
-
Dampers on safety lines.
-
Power cords and guide wires rolled up as to not touch ground or debris.
-
Anchors visually inspected for deficiencies and reported to relevant party.
-
Green Tagged.