Title Page

  • Conducted on.

  • Conducted by.

  • Project Name.
  • Created by Plaza Southeast Safety Team

General Requirements

  • PreTask received from subs

  • Orientation sticker visible on hard hat

  • Toolbox talks received from subs.

  • Competent person identified per trade.<br>

  • First Aid Kit Available Per Subcontractor

  • OSHA 10 received from subcontractor.

Fire Protection

  • Fire Extinguishers provided at each stairwell and signage.<br>

  • Standpipe operational.<br>

  • Standpipe connections protected from accidental struck by incidents.<br>

  • Is FDC connection accessible with signage showing its location?<br><br>

  • All combustibles removed from storage areas.

  • Hot work permit received and signed.

  • Fire Extinguisher at each hot work location.

  • Compressed gas gauges operational.

  • Oxy-Acetylene hoses in proper working condition.

  • Compressed gases stored upright, secured, valve closed or capped, and properly stored.

  • Welding leads are spliced with proper plugs, grounded, and in good condition

  • "No Smoking" signs posted at storage areas.

  • Exit signs posted.

  • Exit staircases accessible and free from debris.

  • Evacuation Plan posted

Personal Protective Equipment

  • 100% Head protection provided.

  • Face shields as necessary.

  • Gloves as necessary.

  • Proper eye protection provided.

  • High-visibility clothing worn by all workers and staff on the job site.

  • Proper footwear provided.

  • Respiratory protection provided as required.

Environmental Controls

  • Restrooms Available. (working deck, every other floor, and ground floor)

  • Drinking Water Available per Subcontractor.

  • Dust Control

  • Lunch Area with trash containers cleaned regularly.

  • Mosquito/Pest Control as necessary.

  • Skip pans/Trash bins available for trash disposal.

  • Storm water prevention in place? (Silt fence, storm drains, socks, filter fabrics)

  • Control of any spilled hazardous material (oils, diesel, etc.).

Material Handling/Storage

  • Are all materials, ladders, tools, etc., within 6 feet of the edge tethered and/or tied off?

  • Material stored 6 feet from shaft openings.

  • Materials and Equipment 2 feet away from edge of excavation/trench.

  • Material stored clear of access routes.

  • Materials stacked or secured to prevent tipping.

  • Materials in the laydown yard organized and providing a clear access route through yard.

Rigging

  • All riggers and signal persons have proof of certification.

  • All loads flown with tag line(s).

  • All rigging equipment provided with rated load capacity and identification tags.

  • Outrigger platforms free of debris and chain in place.

Ladders

  • Podium ladders in use.

  • Ladder being used correctly.

  • Extension Ladder - Cleets intact, Secured.

  • Ladder decals legible.

  • Access/Egress - 2 per working deck.

Vehicles & Traffic on Job site

  • Spotters as needed.

  • Back up alarms functioning.

  • MOT Signage in place as per MOT plan.

Tools

  • Power tools provided with proper guarding.<br>

  • Power tools provided with HEPA Vacuum or other Engineering Controls.

  • Powder actuated tool training certificate available for operator.

Scaffolds/Shoring

  • Scaffolds properly braced to prevent tipping.

  • Mud sills/Base Plates/Casters in Place under each leg

  • Cross brace provided at each frame

  • Cross brace lock devices intact.

  • Proper access provided to each platform.

  • Each platform fully decked.

  • Each shoring scaffold properly decked.

  • Scaffold tag in use.

  • Debris netting provided when falling object hazard exists.

Fall Prevention

  • Fall Protection provided at all areas with a fall exposure of 6 feet or more.

  • Workers properly tied off.

  • Lanyards prevent contact with lower level.

  • Personal Fall Arrest anchors rated for 5000 lbs per worker.

  • Lanyard provided limits free fall distance to 6 feet.

  • Harness & Lanyard Inspection Form submitted.

  • Standard guard rails with handrail, midrail, and toeboard installed.

  • Safety Mesh covering railings.

  • Stairwells with proper railings.

  • Hole covers secured to prevent accidental displacement and marked.

  • Drop and outrigger nets free of debris.

  • Controlled Access Zone (CAZ) setup as necessary.

  • Aerial/Scissor Lift Green Tagged.

  • Aerial/Scissor Lift Operator provided certification.

  • Operator wearing fall protection and tied off.

Mobile Cranes

  • Firm ground conditions.

  • Outrigger pads in place and proper dimension and construction.

  • Swing radius protected.

  • Crane Inspections Available.

  • Crane Operator certification available.

Tower Cranes

  • Access to crane enclosure locked.

  • Crane bases clear of debris and water.

  • Electrical panel elevated out of water and locked out.

  • Crossover access deck adequate and safely banded back to slab.

Electrical

  • All electrical panels locked and labeled.

  • Lock Out/Tag Out in place as needed.

  • Properly installed temporary outlets protected by GFCIs.

  • All extension cords without damage and have ground pins.

  • Extension cords properly plugged into GFCI and out of the way.

  • All common areas well illuminated.

  • Properly installed and maintained lighting suspended under ceiling and grounded.

Excavation

  • Utilities located.

  • Excavation Permit received.

  • Support of excavation methods in place, i.e. Benching, shoring, trench box.

  • Proper access/egress provided as necessary.

  • Proper fall protection provided as necessary.

Equipment

  • All operators trained for the use of the equipment with proof of certification.

  • All tires properly inflated.

  • All windows in place surrounding cabin.

  • Operator's manual available.

  • All operator seats provided with seat belt.

  • Fire Extinguisher available on machinery.

Swing Stages

  • Installation and Daily Inspection reports received.

  • Competent Person Identified.

  • Swing covered in mesh and identified.

  • Dampers on safety lines.

  • Power cords and guide wires rolled up as to not touch ground or debris.

  • Anchors visually inspected for deficiencies and reported to relevant party.

  • Green Tagged.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.