Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Project Details

  • Project

  • Plant Number

  • Plant Make & Model

  • Serial No

  • Plant hours

  • Date of last service

  • Date

  • Assembly supervisor Signature

Checks to carry out

  • Main boom length

  • Main boom configuration

  • Main boom condition

  • Fly jib

  • Fly jib configuration

  • Fly jib condition

  • Boom pins installed correctly

  • Boom pin keepers fitted

  • Pendant pins installed correctly

  • Pendant keepers fitted

  • Unused pendants secured (LG1550 and LR1280 only)

  • Rooster sheave

  • Main hook / number of sheaves

  • Parts of line main

  • Auxiliary hook / number of sheaves

  • Parts of line auxiliary

  • Auxiliary rope reach to ground

  • Reaching route correct

  • Check plates fitted to hook

  • Main dead end secured

  • Main rope tracking on drum correct

  • Auxiliary dead end secured

  • Auxiliary rope tracking on drum correct

  • Boom hoist rope tracking correct

  • Luffing fly rope tracking correct

  • Free fall switches locked

  • Boom hoist pin and clip installed

  • Derrik drum tracking correct (CC2800 and LR1280)

  • Hoist pawns working

  • Tracks extended

  • Track lock pins fitted

  • Outrigger legs extended to correct length (LG1550)

  • Outrigger locks installed (LG1550)

  • Counterweight fitted

  • Car body weight fitted

  • M & I current and in cab

  • Gantry lock pins installed

  • Superweight correct (CC2800 & LR1280)

  • Aviation light (if required)

  • Wind meter fitted and working

  • Luffing fly latch greased and working

  • Track tension adjusted

  • Hoses connected and free of leaks

  • Slew house lock working

  • Main anti two block working

  • Auxiliary anti two block working

  • LMI configuration correct

  • LMI radius correct

  • LMI weight load main correct

  • LMI weight load auxiliary hook

  • Boom upper limit

  • Boom lower limit correct

  • Derrik boom radius correct (CC2800 and LR1280)

  • Ground condition

  • Pads required and size

  • Is crane to have configuration change?

  • Is crane to be de rigged and moved on site?

  • Rigging box required?

  • Rigging gear stored correctly

  • Notes

Smith Crane & Construction Use Only

  • Assembly supervisor

  • Date

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.