Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Project Details
-
Project
-
Plant Number
-
Plant Make & Model
-
Serial No
-
Plant hours
-
Date of last service
-
Date
-
Assembly supervisor Signature
Checks to carry out
-
Main boom length
-
Main boom configuration
-
Main boom condition
-
Fly jib
-
Fly jib configuration
-
Fly jib condition
-
Boom pins installed correctly
-
Boom pin keepers fitted
-
Pendant pins installed correctly
-
Pendant keepers fitted
-
Unused pendants secured (LG1550 and LR1280 only)
-
Rooster sheave
-
Main hook / number of sheaves
-
Parts of line main
-
Auxiliary hook / number of sheaves
-
Parts of line auxiliary
-
Auxiliary rope reach to ground
-
Reaching route correct
-
Check plates fitted to hook
-
Main dead end secured
-
Main rope tracking on drum correct
-
Auxiliary dead end secured
-
Auxiliary rope tracking on drum correct
-
Boom hoist rope tracking correct
-
Luffing fly rope tracking correct
-
Free fall switches locked
-
Boom hoist pin and clip installed
-
Derrik drum tracking correct (CC2800 and LR1280)
-
Hoist pawns working
-
Tracks extended
-
Track lock pins fitted
-
Outrigger legs extended to correct length (LG1550)
-
Outrigger locks installed (LG1550)
-
Counterweight fitted
-
Car body weight fitted
-
M & I current and in cab
-
Gantry lock pins installed
-
Superweight correct (CC2800 & LR1280)
-
Aviation light (if required)
-
Wind meter fitted and working
-
Luffing fly latch greased and working
-
Track tension adjusted
-
Hoses connected and free of leaks
-
Slew house lock working
-
Main anti two block working
-
Auxiliary anti two block working
-
LMI configuration correct
-
LMI radius correct
-
LMI weight load main correct
-
LMI weight load auxiliary hook
-
Boom upper limit
-
Boom lower limit correct
-
Derrik boom radius correct (CC2800 and LR1280)
-
Ground condition
-
Pads required and size
-
Is crane to have configuration change?
-
Is crane to be de rigged and moved on site?
-
Rigging box required?
-
Rigging gear stored correctly
-
Notes
Smith Crane & Construction Use Only
-
Assembly supervisor
-
Date
-
Signature