Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Check all decking for loose sheets & use self tapping screws to secure overlaps

  • Check all decking for missing or loose clips

  • Check all post bracket nuts and bolts for tension

  • Check all main cables clips are 5/8" & make sure they are tightened

  • Check all shackle plates for loose nuts and bolts

  • Check all tie-ups to ensure they are equally tensioned and the platform is level

  • Check all rigid tie-up assembly connections. Ensure all nuts & jamb nuts are installed appropriately

  • Check all rigid tie-up connections to existing steel & cable/decking ensuring all attachments are secure

  • Check all beam flange clamp hangers for secure attachment

  • Check all perimeter railing posts for stability

  • Check all perimeter 1/4" cable for tension (top rail shall not deflect below 39" above deck)

  • Check all perimeter cable for 1/4" cable clamps

  • Check all perimeter posts for caps

  • Check platform for remaining parts and debris

  • Check all connections with conformance with the plans

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.