Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Outside Relative Humidity:
-
Outside Air Temperature:
-
Day of the week
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
Heating, ventilation, and air conditioning equipment in compliance with organization guidelines
-
Thermostat settings meet guidelines.
-
Building temperatures meet guidelines .
-
Fan coil units properly set-back.
-
Night/weekend/holiday set-back procedures followed per regulation 494-1.
-
Boiler/circulating pump operating times OK
-
Time clocks/EMS set correctly.
-
Vestibule/stairwell heaters turned to lowest setting at night.
-
Domestic hot water circulating pumps off during unoccupied times.
-
Mechanical rooms lights off.
-
Security lights/time clocks adjusted correctly
-
Exhaust fans OFF in non-critical areas
-
What are the enter and leave water temperatures for the boilers?
Boiler Temperatures
-
Enter water temperature:
-
Leave water temperature:
-
What are the enter and leave water temperatures for chiller?
Chiller Temperatures
-
Enter water temperature:
-
Leave water temperature:
-
Other
Building Envelope
-
Exterior/vestibule doors shut when heating/cooling in use.
-
Windows shut.
-
Weather stripping and door sweeps okay.
-
Other
General Building
-
Hallway lights off.
-
Restroom lights off.
-
Lounge lights off.
-
Workroom lights off.
-
Storage rooms lights off.
-
Custodian closets lights off.
-
Copiers, office equipment OFF
-
Other.
Administration
-
Offices lights off.
-
Computers shutdown (except Wed and Thurs) and monitors off
-
Copiers, office equipment OFF
-
Other.
Library/Media Center
-
Library lights off.
-
Computers shutdown (except Wed and Thurs) and monitors off
-
Other.
Kitchen/Cafeteria/Multipurpose
-
Kitchen lights off.
-
Dining area lights off.
-
Exhaust fans and hoods off.
-
Other.
Classrooms
-
Instruction room doors shut when heating/cooling air in use.
-
Lights off in unoccupied.
-
Computers shutdown (except Wed and Thurs) and monitors off
-
Audio-visual equipment OFF
-
Other.
Gym/Physical Education
-
Gymnasium lights off
-
Computers shutdown (except Wed and Thurs) and monitors off
-
Locker rooms lights off.
-
Other.
School grounds and fields
-
Other
Plumbing/irrigation:
-
Organization's water guidelines being observed
-
Water fountains operating properly
-
Faucets operating properly
-
Commodes and urinals properly adjusted
-
Mechanical room plumbing OK
-
Cooling tower operating properly
-
Other
Miscellaneous:
-
Logger data being collected.
Other
-
Other
-
Add media
-
Energy Specialist