Title Page
-
Visit No.
-
Client.
-
Client site.
-
Costing reference.
-
Assignment description.
-
Assignment supervisor.
-
Lead Engineer.
-
Date.
-
Quality Surveyor.
Management report.
-
Job information sufficient by supervisor?
-
What information do you require?
-
Do you have the relevant paperwork?
-
What information do you require?
-
Do you have the correct materials?
-
What is in-correct?
-
Do you have enough to continue?
-
What is the quality of the materials?
-
How is the alloted time frame?
-
How much more time is required?
-
Do you have the correct tools & equipment?
-
What do you require to perform the task?
Engineer report
-
All correct PPE being used to site specific?
-
Have you signed into all appropriate documents?
-
Have you checked asbestos report before commencing work?
-
Why is this not relevant?
-
Carrying out tasks given in accordance with RAMS?
-
House keeping standards?
-
Quality of installation?
-
Pictures & Test results recorded on pad for office?
-
Any comments / recommendations?
Labour report
-
Apprentice or helper?
-
Behaviour on site?
-
Ability to carry out tasks?
-
House keeping?
-
Awareness to safety?
-
General development?