Title Page

  • Client.

  • Client site.

  • Costing reference.

  • Lead Engineer.

Initial Inspection.

  • Is 4.0m scaffold required?

  • What access is required?

  • Charging unit operating correctly?

  • Make/model of charging unit?

  • Reel condition?

  • Reel fixings secure?

  • Reel cable condition?

  • Foam condition?

  • 2No foams fitted?

  • Hi-vis tape fitted?

  • Plug condition?

  • Plug cable grip tight?

  • Terminals correct polarity?

  • Ferrule on cable terminations?

Completed Inspection

  • Charging unit operating correctly?

  • Reel condition?

  • Reel fixings secure?

  • Reel cable condition?

  • 2No foams fitted?

  • Hi-vis tape fitted?

  • Plug condition?

  • Plug Cable grip tight?

  • Terminals correct polarity?

  • Ferrule on cable terminations?

  • Voltage recorded at plug top?

Parts Installed

  • 24v Charger Reel

  • Foam x2

  • Hi-vis tape

  • 24v violet plug top

  • Ferrule crimps

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.