Title Page
-
Client.
-
Client site.
-
Costing reference.
-
Lead Engineer.
Initial Inspection.
-
Is 4.0m scaffold required?
-
What access is required?
-
Charging unit operating correctly?
-
Make/model of charging unit?
-
Reel condition?
-
Reel fixings secure?
-
Reel cable condition?
-
Foam condition?
-
2No foams fitted?
-
Hi-vis tape fitted?
-
Plug condition?
-
Plug cable grip tight?
-
Terminals correct polarity?
-
Ferrule on cable terminations?
Completed Inspection
-
Charging unit operating correctly?
-
Reel condition?
-
Reel fixings secure?
-
Reel cable condition?
-
2No foams fitted?
-
Hi-vis tape fitted?
-
Plug condition?
-
Plug Cable grip tight?
-
Terminals correct polarity?
-
Ferrule on cable terminations?
-
Voltage recorded at plug top?
Parts Installed
-
24v Charger Reel
-
Foam x2
-
Hi-vis tape
-
24v violet plug top
-
Ferrule crimps