Title Page
-
Store No.
-
CLIENT
-
Site / Store Name
-
Conducted on
-
Conducted by
-
Location
-
ATL Lead Installer - Name
-
All Other ATL Installers on Site - Names
Pre Start Compliance
-
Have ALL ATL Installers Signed in, Shown CSCS Cards and been site inducted.
-
Do ALL ATL installers have in date client based training scheme certification
-
Do the Installation team know what to do in the event if a fire & evacuation procedure
-
Is the Installation team aware of first aid and use of welfare facilities.<br>
-
Does each Installer know how to report an accident and who to inform.
-
Is there any requirement to change Safe System of Work from the Risk Assessment and Method Statement.
-
RAMS Installation Declaration been signed by Team Leader, Each Team Member and Site Manager - Provide Photo of Sheet
Site Compliance
-
Does each Installer have and a hard hat.<br>
-
Does the Installer have a Tesco / ATL branded hi-viz vest.
-
Is the correct safety footwear being worn by all Installers
-
Does each the Installer have the relevant eye/ear protection and safety gloves as outlined in the Risk Assessment
-
Is all PPE in good condition.
-
Is there a first aid box present on van and fully stocked.
Equipment & Safety
-
Are Barriers in Place and of the Correct Type i.e. ( Chapter 8 Clearpath) - Please provide Photo<br>
-
-
Has Disc cutter been inspected and associated tooling been inspected and free of faults / damage with correct guards in place
-
-
Is the disc cutter water reservoir filled and working correctly for dust suppression
-
undefined
-
Is there clear access and egress to and from the work area.
-
Have measures been taken to reduce trip hazards.
-
Is the general public adequately protect from works i.e. (is clear area from cutting)
-
IOW Instruction of Work
-
Has the GATEKEEPER IOW been provided and understood
-
-
Has the GATEKEEPER Cart Control Layout Plan Been Provided
-
-
Are there any Issues with the Route Highlighted (Blue) for the Signal Cable - NOTE: If Yes Highlight on Plan the Change of Route
-
Are there any Issues with Completing the Lock (Red) & Unlock (Green) Loop shown on the layout plan - NOTE: If Yes Highlight on Plan the Change of Route
QC Record of Works
-
Provide Photos of All Cables entering Buildings Internal & External
-
Provide Photos of All Signal Cable Routed Internally
-
Provide Photos of All Signal Cables Cuts Routed Externally
-
Provide Photos of All Lock & Unlock Loop Cuts
-
Provide Photos of All Signal Cable Routes with Completed Sealant Finish
-
Provide Photos of All Lock & Unlock Loops with Completed Sealant Finish
-
Have all works been completed to Agreed Standards
Completion Of Works
-
Provide Photo of Completed GATEKEEPER IOW
-
Provide Confirmation & Photo of System Operational 'Live Mode'
Any other comments or info
-
Provide any other Details as Required
Audit Sign Off
-
ATL Team Leader
-
Store / Site Duty Manger