Title Page
-
Site conducted
-
Conducted on
-
Prepared by
ATP Testing Log
-
ATP Limits (Pass ≤100 RLU/Fail >100 RLU)
-
Did the packing house run this week?
Sample Point #1
-
Date and Time
-
Equipment Name
-
ATP Result (RLU's)
-
Was area re-cleaned and re-sanitized?
-
ATP Re-test Results (RLU's)
-
Test Completed by
Sample Point #2
-
Date and Time
-
Equipment Name
-
ATP Result (RLU's)
-
Was area re-cleaned and re-sanitized?
-
ATP Re-test Results (RLU's)
-
Test Completed by
Sample Point #3
-
Date and Time
-
Equipment Name
-
ATP Result (RLU's)
-
Was area re-cleaned and re-sanitized?
-
ATP Re-test Results (RLU's)
-
Test Completed by
Sample Point #4
-
Date and Time
-
Equipment Name
-
ATP Result (RLU's)
-
Was area re-cleaned and re-sanitized?
-
ATP Re-test Results (RLU's)
-
Test Completed by
-
Signature of Manager or Supervisor is required as verification that tasks were completed
-
Name & Signature
-
Date Completed:
Luminometer Calibration
-
Was Luminometer Calibration Required?
-
Was calibration within range?
- Yes
- No
- Off-Season
-
Calibration completed by:
Verification
-
Document verified by?
-
Date