Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Date
-
Name of Person Conpleting JHA
-
Site Location
-
Contractor Name
-
Primary Job Tasks
Job Hazzard Information
-
Is there a SWMS for this job task
-
If yes, have your team been toolboxed on the SWMS
-
Are other locations effected by the job task
-
If yes, involve them in discussion and toolbox
-
Are there adequate PPE supplies for the Job Task
-
If NO, no work is to commence until risk is reduced
-
Enter the job steps and corresponding Risk and control levels
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Step
-
Risk Level
-
What are the potential Dangers involved
-
How is this being controlled
-
Risk Level After Control Measures
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature
-
Add signature