SITE PRE START CHECK
-
Person Conducting Analysis
-
Site / Project
-
Site Location
-
Date
-
Leading Traffic Officer
-
Shift Start Time
-
Traffic Control Officers
-
Traffic Unit(s)
-
Traffic Assets
- C Class Arrow Board
- VMS Board
- Day Makers
- Truck Mounted Attenuator
- Portable Traffic Signals
-
Road Occupancy
-
What is the subject road jurisdiction
-
Have all ROL / Permits been supplied
-
ROL Number(s)
-
ROL START TIME
-
ROL END TIME
-
Conditions of ROL
-
Speed Zone Reduction
-
Works Scope
-
What is the primary scope of works
-
Road Configuration
- Single Lane One Direction
- Single Lane Both Directions
- Multi Lane One Direction
- Multi Lane Both Directions Undevided
- Multi Lane Both Directions Devided
- Slip Lane
- On / Off Ramp
- Footpath
-
Road Conditions
- Straight
- Corner
- Hill / Crest
- Intersection Not Controlled
- Intersection Controlled
- Dirt / Gravel
- Roundabout
-
Proposed Traffic Control
- Stop / Slow
- Standard Lane Merge
- Contraflow
- Lateral Shift
- Part Road Closure
- Full Road Closure
- Chicane
- Directional Lane Supression
- Ramp Closure
- Mobile Works
- Frequently Changing Work Area
- Pedestrian Control
-
Will the works involve the removal or excavation of the road
-
Will the works involve the removal or excavation of the footpath
-
Will workers on foot be within 1.2 meters from live traffic
-
Traffic Control Staff
-
Are all Traffic Control Officers qualified and holding the correct tickets
-
Are all Traffic Control Officers wearing the correct PPE
-
Are all Traffic Control Officers fit for work
-
Have Traffic Staff received appropriate pre start and toolbox information and understand the TGS and works scope
-
Have All Traffic Staff been indicted onto the site if required
-
Supervisor Comments
-
Setup Assessment Before Starting Works
-
Have all ROLs been activated if required
-
The site has been implemented according to the TGS
-
The site complies with the Traffic Control At Worksites Manual
-
Any modifications to the TGS
-
Modified By
-
Have all existing speed signage been covered as required
-
All Tapers comply with Section 5.2 TCAWS
-
Advance Warning is sufficient for the works
-
Key Safety Measures for Traffic Managment
-
Are all Traffic Control Officers in a safe location with an unobstructed escape route
-
Traffic is flowing correctly without obstruction
-
A Rolling Inspection of the site should now be conducted to assess any and all impacts with the site
-
A rolling inspection has been conducted and works are safe to proceed
-
Safety and Compliance
-
What are the key points raised during the site Prestart meeting
-
What are the anticipated hazards on the worksite
-
What controls are in place to control these risks
-
Are there any compliance issues that have been raised
-
Post Works Report
-
The worksite has been safely secured and normal conditions have been restored
-
All ROLs have been called of as required
-
Were there any major incidents on site
-
Are there any issues regarding the conduct of Traffic Staff
-
Are there any issues relating to the safety and conduct on the worksite
-
Are there any suggested improvements for minimizing risk for future works
-
As the Duty Traffic Supervisor overseeing the management of Traffic Operations for this site, i am confident that all efforts have been made to ensure the safety and compliance of the works conducted are inline with the expectations of ATS
-