Information
-
Document No.
-
Audit title.
-
Client / Site
-
Conducted on
-
Who is the registered AE controlling this operation.
- S COURSE
- C STEER
-
CP Carrying out the RO / NRO
-
Location
-
RO or NRO
- RO
- NRO
-
Time / date of operation
-
Has the GT authorised the operation.
- YES
- NO
- N/A
-
RO or NRO number
-
Picture of front page of RO or NRO
-
Has the AE and the GT been informed that the operation is about to start
- YES
- NO
- N/A
-
Team members on site
- N SMART
- K AINSWORTH
-
Have the operatives got the correct qualifications and experience to carry out the connection.
- YES
- NO
- N/A
Proof of Certification
-
Picture of certs.
Operation
-
Phase 1
Phase
-
RO/NRO Number:
-
Is phase 1 prepared as per the authorised RO / NRO
- YES
- NO
- N/A
-
Picture of main before operation.
-
Are all fittings and equipment on site.
- YES
- NO
- N/A
-
Picture of fittings & Equipment.
-
Has the operation been completed as per the RO / NRO
- YES
- NO
- N/A
-
Picture of completed operation.
-
Picture of completed & signed RO/NRO
Completion.
-
Notes on operation.
-
Auditors name and signature.