Information
-
Document No.
-
Pre start site audit
-
Client / Site
-
Conducted on
-
Prepared by:
- S HARDY
- N SMART
- K AINSWORTH
- M DUCE
- A AINSWORTH
- A MANSELL
-
Location
-
Site Manager Name:
Use this pre start site audit to establish if the site is ready for the planned works.
-
Proposed works date.
-
Has auditor got an GT approved design with them, if not get from acrobat.com
- YES
- NO
-
Does the design reflect what you see on site:
- YES
- NO
-
Have the site staff been instructed on what is expected of them.
- YES
- NO
-
Is there any scaffolding up or are there any plans to install scaffolding before works date.
- YES
- NO
-
Picture of scaffolding
scaffolding
-
Add media
-
If yes will the scaffolding be removed prior to instant ate.
-
Date scaffolding will be removed.
Site information / pictures
Site pictures.
-
Site pictures
-
Auditor's observations.
-
Will the site be ready on the proposed works date
- YES
- NO
-
If the answer is NO above what action is needed to be made by the site to be ready for proposed date.
-
Picture of works required.
Picture
-
Name of site manager.