Information
Job Details
-
Job Number
-
Audit Date
-
Auditor
Site Access / Arrangement Facilities
-
Site Name
-
Site Address
-
Site Specific Comments
-
Parking Available
-
Access Approval / Comments
Customer Service
-
Did the engineer introduce himself and show his ID?
-
Was the engineer's uniform clean and well presented?
-
Did the engineer explain what the install would entail and how long?
-
Did the engineer communicate effectively?
-
Did the engineer follow the appropriate agreed site access processes?
-
Did the engineer work in a safe and appropriate manner?
-
On completion of the install, did the engineer give an explanation and demonstration of how the system worked?
-
Has the site been left clean and tidy?
Installed Equipment
-
Is the equipment cabinet safely installed and fitted correctly?
-
Are the mains power supply safely connected (visual inspection only)?
-
Is the mains power supply clearly marked for the use of The Cloud labels?
-
Is the installed equipment clearly labelled with The Cloud labels?
-
Is the reset label fitted to the reset switch on rear of AP's?
-
Has any equipment installed in the equipment cabinet been correctly installed and fixed as appropriate?
-
Are all cabling and connections to the installed equipment terminated correctly and safely fitted?
-
Are any patch leads installed correctly i.e. not tight or with excessive slack/additional cable?
-
Are any fibre cables correctly installed and free from kinks or tight bends?
AP's Installed
-
Have all AP's on site been correctly and safely installed?
-
Are all AP's free from scratches, dents and blemishes?
-
Is a picture available showing orientation?
-
If the AP has been connected using a patch lead to installed socket, is this correctly fitted without any undue slack cable?
-
If AP is connected to mains supply, is this correctly fitted without any undue slack cable?
Cables Installed
-
Are all cables safely and correctly fixed and installed?
-
Are all cables installed neatly?
-
Have any cable entry or exit points been resealed using appropriate stoping methods?
-
Have any Cloud supplier installed trunking, ducting or conduits been correctly and safely fitted utilising the correct bends, tees, drops etc. with no sharp edges and with the lid fully fitted?
-
If the Cloud cables have been run on/in existing customer tray, trunking or conduits has this been carried out in a safe manner with appropriate measures taken to avoid crossing or burning existing cables?
-
If Cloud cables have been run on/in existing customer tray, trunking or conduits, has this been carried out whilst keeping the appropriate distance from any existing services or power cables?
-
Are data point termination clearly labelled?
-
Has all cable termination points in cabinet been clearly labelled?
AP Deployment and Basic Functioning Testing
-
Access Point ID
-
AP Location
-
AP Serial Number
-
AP MAC Address
-
AP Mount orientation aligned for optimum visibility to adjacent AP's
-
External antenna caps tightened down
-
DC Power cover securely in place
-
Primary Ethernet port cable gland secure
-
Secondary Ethernet port weather proof cap tightened down?
-
AP mount secure
-
Mains power connected
-
AP power LED illuminated
-
AP successfully boots up
-
Mesh successfully established
-
The Cloud SSID broadcast
-
BSSID associated with SSID
-
Associated with SSID:_The Cloud
-
IP setting acquired via DHCP
-
Client IP address
-
DHCP server address
-
DHCP lease time
-
Cloud landing page presented in browser
-
Venue ID
-
Download speed (Mbps)
-
Upload speed (Mbps)
-
Latency (ms)
Additional Comments or Observations
-
Router photograph
-
AP Photograph
-
InSSIDer Screenshot