Title Page
-
Location
-
Conducted on
-
Prepared by
-
Site name and city
-
Job number (if applicable)
AYJAY - WIF / WIC
WIF / WIC
-
Location of WIC / WIF (or potential location)
-
Photo of WIC / WIF (Area photo taken from afar)
-
Clear picture inside of cold-room (If applicable)
-
Condition and functionality of accessories within cold-room inc. Lighting
-
Picture on top of cold-room (If applicable)
-
Picture above ceiling (if applicable)
WIF / WIC Panel (If applicable)
-
Picture of panel (or proposed location)
-
Clear picture inside panel inc. Protective devices
-
Condition of panel
-
Pictures of any defects to the panel ie. water ingress, or damage
-
Condition of Final circuits from panel
-
Zs at Panel
Supply to Panel
-
Size and type of cable
-
Picture of supply cable to Panel (If applicable)
-
Condition of Supply cable and cable entry / gland (Visual check) (If applicable)
-
Pictures of cable run / proposed run
-
Length of run from DB supplying WIC / WIF panel
DB Supplying panel
-
Location of supply DB
-
Picture of DB Location (area photo taken from afar)
-
DB Type and manufacturer
-
Clear Picture of DB inc. protective device's
-
Protective device supplying unit (Type and size)
-
Number of spare ways / unused protective devices
-
Zs at DB
Mains Details
-
Location of incoming supply
-
Picture of incoming supply location (taken from afar)
-
Rating and type of mains Isolator
-
Picture of mains isolator
-
Number of phases
-
Rating and Type of DNO Fuses (Visual if able)
-
Picture of DNO fuses
-
Type of Earthing
-
Date of Last EICR
Additional Notes
-
Any important information