Information

  • Inspection Test Plan

  • Client

  • Project

  • Project number

  • Site Address
  • Technician Name

  • Conducted on

Equipment

    Equipment
  • Equipment ID

  • Conductor Size(mm)

  • Conductor type

Inspections & Tests Required

  • Visual

  • Reference AS/NZS:3000 Section 8.2

  • Earth Continuity

  • Equipment Required Trailing lead/Ohm meter

  • Reference AS/NZS:3000 Clause 8.3.5

  • Insulation resistance

  • Equipment Required Insulation resistance tester(Megger)

  • ReferenceAS/NZS:3000 Clause 8.3.5

  • Polarity

  • Equipment Required Test lamps/Multimeter

  • Reference AS/NZS:3000 Clause 8.3.7

  • Earth Leakage

  • Equipment Required Earth leakage/RCD tester

  • Reference AS/NZS:3000 Clause 8.3.10

  • Labeling, visual inspection

  • Reference AS/NZS:3000 Clause 8.2.2

  • Motor winding resistance<br>

  • Equipment Required Trailing lead

  • Current draw

  • Equipment Required Ammeter/Clamp meter

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.