Information
-
Audit Title
-
Audit Number:
-
District:
- East Kimberley
- West Kimberley
- East Pilbara
- West Pilbara
- Gascoyne
- Mid West
- Esperance
-
Town / Location
-
Audit start date
-
Prepared By
- Mat Wilson - 700721
- Kevin Shaw
- Todd Woods - 700571
- Rowly Hill - 2168
Audit Summary
Audit Executive Summary
Recommendations
-
Auditor Recommendations to drive continuous improvement
Recommendation
Items Audited
Audit locations & projects if known
-
Project audited
Project
-
Project number and name:
-
Work Order/s:
-
Location:
-
Assets installed & asset Id numbers
-
Desktop audit
-
Scope of Work:
-
Job planning sheet completed
-
JRA completed
-
Test & Commissioning completed
-
Data sheets completed
-
Hand over certificate completed
-
Site QA Checks
-
Assets audited
Asset checked
-
Asset Id:
-
Safety Checks<br><br>
-
Quality & Compliance Audit result
Audit References
Audit References - Items not followed
Horizon Power Distribution Construction Standards
-
DCS PART 2- REFERENCES (WIP)
- Pole Bolt - R1
- Bonding - R2/1
- RDA - R2/2
- Insulators - R3/1
- Insulator Ties R3/2
- Armour Rods R3/3
- Insulator Pin & Bolt R4
-
Add media
-
DCS PART 3 - HIGH VOLTAGE UNDERGROUND (WIP)
-
Add media
-
DCS PART 4 -HIGH VOLTAGE OVERHEAD (WIP)
-
Add media
-
DCS PART 5- LOW VOLTAGE UNDERGROUND. (WIP)
-
Add media
-
DCS PART 6- LOW VOLTAGE OVERHEAD (WIP)
-
Add media
-
DCS PART 7 -LOW VOLTAGE ABC (WIP)
-
Add media
-
DCS PART 8 - STREET-LIGHTING. (WIP)
-
Add media
-
DCS PART 9 - MISCELLANEOUS. (WIP)
-
Add media
Industry Standards
-
Common Industry Standards
- Industry Stds (WIP)
- WAER
- AS/NZS 7000
- AS 3000
Horizon Power Interim Instructions / Manuals / Processes / Procedures/ Standards
-
FIPSM Interim Instructions
- FIPSM Interim Instructions
- II 30 Stay wire Insulated Cov
- II 31 MEN Mult Met
-
Standards (non DCS) (WIP)
- Yes
- No
- N/A
-
Asset & Works Interim Instructions (WIP)
-
Asset & Works Maintenance Instructions (WIP)
-
Horizon Power Manuals (WIP)
- FIPSM Work Procedures
- WP01 - Vegetation mgmnt
- WP02
- WP03
- WP04
- WP05
- WP06
- WP07
- WP08
- WP09
- WP10
- WP11
- WP12
- WP13
- WP14
- WP15
- WP16
- WP17
- WP18
- WP19
-
FIPSM Work Procedures ( section 5) (WIP)
- FIPSM Work Procedures
- WP01 - Vegetation mgmnt
- WP02
- WP03
- WP04
- WP05
- WP06
- WP07
- WP08
- WP09
- WP10
- WP11
- WP12
- WP13
- WP14
- WP15
- WP16
- WP17
- WP18
- WP19
Sign Off
AUDITOR COMPLETION - SIGN OFF
-
Issued To:
-
Non Conformance report issue date.
-
Non Conformance completion required by date.
-
Issued By:
- Mat Wilson - 700721
- Kevin Shaw
- Todd Woods - 700571
- Rowly Hill - 2168
-
Auditor signature