Title Page

  • Document No: HSCF040

  • Management Site Inspection:

  • Project Name/Number:

  • Location:
  • Project Team:

  • Completed By:

  • Audit Date:

1.0 Site Security

  • 1.1 Is the site secure and entrance gates locked?

  • 1.2 Are the correct site contact details displayed at the site entrance?

  • 1.3 Are all site personnel and visitors signing in and out of site?

  • 1.4 Are signing in registers fully completed

  • 1.5 Any additional comments?

2.0 Site Safety Signage

  • 2.1 Is signage displayed at all site entrances which informs site operatives, clients staff, and site visitors aware of the site rules, PPE requirements and signing in procedures?

  • 2.2. Are site personnel and visitors wearing the correct PPE?

  • 2.3. Are all fire escape routes clearly indicated?

  • 2.4. Any additional comments?

3.0 Contractors Supervisory Arrangements

  • 3.1 Do all contractors have on site supervision for their staff?

4.0. Site Notice & Hazard Board

  • 4.1. Are both site notice and hazard boards fixed and clearly visible?

  • 4.2. Are relevant documents displayed on the site notice board including F10 (if applicable)?

  • 4.3. Is the sites hazard board current and updated on a regular basis?

  • 4.4 Any additional comments?

5.0. Project Paperwork

  • 5.1 Is the projects construction phase health & safety plan available and updated on a regular basis?

  • 5.2 Are RAMS reviewed by the PM and signed by operatives carrying out the work?

  • 5.3 Are RAMS reviewed using the standard checklist?

  • 5.4 Are toolbox talks relevant to site activities delivered on a regular basis?

  • 5.5 Are inductions being delivered to site operatives and visitors?

  • 5.6 Are inductions recorded and records complete?

  • 5.7 Is there a permit to work system for using stepladders?

  • 5.8 Are permits being completed correctly?

  • 5.9 Any additional comments?

6.0 Agency Staff

  • 6.1 Are there any agency staff working on site?

  • 6.2 Are they competent to carry out the tasks allocated to them?

  • 6.3 Are risk assessments in place for the tasks they will be carrying out?

  • 6.4 Have RAMS been communicated to the agency workers and signed by those carrying out the works?

  • 6.5 Has the correct PPE been issued for the tasks being carried out?

  • 6.6 Has all PPE issues been recorded and signed for by the agency worker?

7.0 Asbestos

  • 7.1 Where applicable has an R&D survey been carried out on the areas where the works are to be carried out (if applicable)?

  • 7.2 Did the survey identify any ACM's present in the work area?

  • 7.3 Is there potential to disturb ACM's present in the building?

  • 7.4 Are there any asbestos removal works required?

  • 7.5 If yes who will be carrying out the work? Are RAMS, training & face fit tests certificates available?

  • 7.6 Any additional comments?

8.0 Welfare

  • 8.1. Does the canteen facilities include fridge, microwave, kettle, drinking water?

  • 8.2. Does the toilet facilities include, hot water,soaps and drying facilities

  • 8.3. Are the welfare areas clean and tidy including microwave and fridge?

  • 8.4 Are cleaning materials available

  • 8.5. Any additional comments?

9.0. Housekeeping

  • 9.1. Are all access and egress routes free from obstructions and adequately lit?

  • 9.2. Is the general condition of the site acceptable including skip areas, storage of materials and contractors work areas?

  • 9.3 Is site operatives and contractors appearance acceptable and is branded PPE worn?

  • 9.4. Any additional comments?

10.0 First Aid & Accident Reporting

  • 10.1 Is there a first aider on site?

  • 10.2 Is there a first aid kit available which is fully stocked?

  • 10.3 Is there an accident book on site?

  • 10.4 Has there been any accidents/incidents on site?

  • 10.5 Are accident/incident reports returned to the site office?

  • 10.6 Any additional comments?

11.0 Fire

  • 11.1 Is there an adequate number and types of fire extinguishers on site?

  • 11.2 Are fire extinguishers evenly spaced around the site as shown in fire plan?

  • 11.3 Have fire extinguishers been serviced/maintained?

  • 11.4 Is there a permit to work system for hot works?

  • 11.5 Are permits being completed correctly?

  • 11.6 Any additional comments?

12.0 Work Equipment

  • 12.1 is there an inspection regime in place for all plant (including access equipment)? Are checklist being used?

  • 12.2 Is the thorough examination certification available for lifting equipment (inc MEWPS)?

  • 12.3 Are operatives training certificates available (PASMA/IPAF)?

  • 12.4 is there adequate extraction fitted to equipment which has the potential to create dust/fume?

  • 12.5 Is the extraction being used?

  • 12.6 Any additional comments?

13.0 Waste Management

  • 13.1 What company(s) are being used to remove waste from site?

  • 13.2 Are waste transfer notes provided by the waste contractor(s)?

  • 13.3 Is there hazardous waste being removed from site e.g. asbestos? If yes who is removing the waste?

  • 13.4 Any additional comments

14.0 Corporate Social Responsibility

  • 14.1 Can you identify any CSR activities on this site which can be added to the projects Thrive profile?

  • 14.2 If yes to 14.1, describe the activities and attach photos and save to the project folder

15.0 Additional Comments

  • Place any additional comments here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.