1.0. Project Status
1.1. Works Completed
-
undefined
-
Add media
1.2. Progress Vs Programme
-
undefined
1.3. Contractors Performance (Please provide who and the reasons to justify the positive/negative feedback you have provided).
-
undefined
-
Add media
1.4 Site Issues
-
undefined
-
Add media
1.5 Has weather conditions caused delays to the programme of works?
1.6. Number of Skips Removed From Site (current week)?
-
undefined
1.7. Number and Type of Toolbox Talks Delivered (current week)? Topic/duration, please attach register
-
undefined
-
Add media
1.8. What positive interventions have been identified (type & number)?
-
undefined
1.9. Can you identify any Corporate Social Responsibly activities which can be added to the projects Thrive profile? Please list.
-
undefined
1.10. Additional Comments
-
undefined
-
Add media
Section 2.0. Project Forecast
2.1. Scheduled Works (Next Week)
-
undefined
2.2. Scheduled Deliveries (Next Week)
-
undefined
2.3. Labour Requirements (What labour is expected on site?)
-
undefined
2.4. Additional Information
-
undefined
3.0. Health Safety & Environmental Report
3.1. Site Security
-
3.1.1. Is the site secure and entrance e.g. gates, doors locked?
-
3.1.2. Are all site personnel and visitors signing in and out of site?
-
3.1.3. Any additional comments?
3.2 Site Safety Signage
-
3.2.1. Is the correct signage displayed at all site entrances
-
3.2.2. Does the site safety sign inform operatives, clients staff, and visitors of the sites PPE requirements, signing in procedures & site rules?
-
3.2.3. Is the correct Project Managers name & contact details displayed on site safety signs?
-
3.2.5. Any additional comments?
3.3. Site Notice & Hazard Board
-
3.3.1. Are both site notice and hazard boards fixed and clearly visible?
-
3.3.2. Are relevant documents displayed on the site notice board including F10 where applicable?
-
3.3.3. Are all documents displayed current?
-
3.3.4 Is the hazard board updated daily?
-
3.3.5. Any additional comments?
3.4 Agency Staff
-
3.4.1 Are there any agency staff working on site?
-
3.4.2 Are they competent to carry out the works (Please provide training evidence)
-
3.4.3 Are risk assessments in place for the tasks they will be carrying out?
-
3.4.4 Have the RAMS been communicated and signed by those carrying out the works?
-
3.4.5 Have the correct PPE been issued for the tasks they are carrying out
-
3.4.6 Have all PPE issues been recorded and signed for by the agency worker?
3.5. Project Paperwork
-
3.5.1. Is the projects construction phase plan available?
-
3.5.2. Are RAMS being reviewed using the RAMS checklist? Has feedback been passed onto the contractor
-
3.5.3. Are the RAMS being signed by the operatives carrying out the tasks?
-
3.5.4. Has the contractors supervisor communicated task specific RAMS to their operatives?
-
3.5.5 Are site inductions being delivered to site operatives & visitors?
-
3.5.6. Are induction records fully completed?
-
3.5.7. Are permit systems in operation e.g. hot works, electrical isolation?
-
3.4.8. Any additional comments?
3.6 Asbestos
-
3.6.1 Has an R&D survey been carried out on the areas where the works are to be undertaken
-
3.6.2. Did the survey identify any ACM's present in the area?
-
3.6.3. Is there the potential to disturb the ACM'S?
-
3.6.4. Are any asbestos removal works required?
-
3.6.5. If yes who will be carrying out the work? Are RAMS, training and face fit test certificates available?
-
3.6.6. Any additional comments?
3.7. Welfare
-
3.7.1. Does the canteen facilities include fridge, microwave, kettle, drinking water?
-
3.7.2. Does the toilet facilities include, hot water, soaps and drying facilities?
-
3.7.3. Are the welfare areas clean and tidy?
-
3.7.4. Are there adequate cleaning materials available for cleaning tables before & after use?
-
3.7.5. Is there a facility for drying clothes
-
3.7.6. Any additional comments?
3.8. Housekeeping
-
3.8.1. Are all access and egress routes free from obstructions and adequately lit?
-
3.8.2. Is the general condition of the site acceptable including skip areas, storage of materials and contractors work areas?
-
3.8.3 Are site operatives and contractors appearances acceptable and is branded PPE worn?
-
3.8.4. Any additional comments?
3.9. First Aid & Accident/Incident Records
-
3.9.1. Is there a First Aider on site?
-
3.9.2. Is there a first aid kit on site which is fully stocked?
-
3.9.3 Is there an accident book on site?
-
3.9.4. Has there been any accidents/incidents on site?
-
3.9.5 If yes has an accident/incident report been completed?
-
3.9.6 Any additional comments?
3.10. Fire
-
3.10.1. Are fire escape routes clear with fire escape signage displayed?
-
3.10.2. Is there an adequate number of fire extinguishers on site?
-
3.10.3. Are extinguishers positioned around the site?
-
3.10.4. Have all fire extinguishers been serviced?
-
3.10.5 When is the next service due (NSD)?
-
3.10.6 If service date has expired has it been report to Logistics?
-
3.10.7. Is there a permit system in place for hot works?
-
3.10.8. Is there a fire extinguisher located where the hot works are being carried out?
-
3.10.9. Any additional comments?
3.11. Plant & Equipment
-
3.11.1 Is there an inspection regime in place for all plant (including access equipment)
-
3.11.2 Are operatives trained & competent to use or operate plant & equipment? Has evidence been provided?
-
3.11.3 Are operatives training certificates available (e.g. PASMA, IPAF, CPCS)?
-
3.11.4 Is there adequate dust extraction fitted to equipment which has the potential to create dust?
-
3.11.5 Is lifting equipment subject to a thorough examination (including access equipment)
-
3.11.6 Any additional comments?
3.12 Work at Height
-
3.12.1 Has the safest option been used to access work at height?
-
3.12.2 Are mobile towers erected/dismantled by PASMA certified operative?
-
3.12.3 Are towers inspected a minimum of every 7-days?
-
3.12.4 Is fixed scaffold subject to an inspection every 7-days by a competent person?
-
3.12.5 Are MEWPS operated by IPAF certified operatives?
-
3.12.6 Are MEWPS being checked prior to use by a IPAF trained operative? Is the Bbi checklist being used?
-
3.12.7 Are MEWPS subject to 6-monthly thorough examination?
-
3.12.8 Have all works which require the use of stepladders been assessed and a permit issued?
-
3.12.9 Any additional comments?
3.13 PPE Requirements
-
3.13.1 Is site operatives and contractors appearance acceptable?
-
3.13.2 Are all operative wearing PPE identified in the risk assessment and compliance with the site rules?
-
3.13.3 Is hand protection being worn at all times? Are the gloves rated D or above?
-
3.13.4 Any additional comments?
3.14 Waste Management
-
3.14.1 What are the name(s) of the company(s) used to remove waste from site?
-
3.14.2 Are copy(s) of the waste carrier licence(s) available?
-
3.14.3 Are waste transfer notes provided by the companies removing waste from site? State whether hard copies or electronic.
-
3.14.4 Is hazardous waste being removed from site? If yes who is removing the hazardous waste?
-
3.14.5 Are hazardous waste consignment notes being provided?
-
3.14.5 Any additional comments?
4.0 Additional Comments
-