Information

  • Audit No.

  • Site ID and Audit Address

  • Audit Type

  • Electrical / Civil Construction Team Leader / Contractor

  • Client

  • Conducted on

  • Audited by

General Requirements

GENERAL REQUIREMENTS

  • NOTE:- AUDITEE TO PROVIDE PHOTOGRAPHIC EVIDENCE OF DEFECT RECTIFICATION

  • 1. GENERAL REQUIREMENTS

  • This audit checks for compliance with an IMS procedure?

  • 1.1 IMS Procedure Number?

  • 1.2 Did the audited task comply with the related procedure?

  • 1.3 Has SIR or Rectification Notice been issued? Record number here?

  • 2. Document and Plan Requirements?

  • 2.1 Accurate "As Constructed" plan included in returned documentation?

  • 2.2 Detailed Certificate of Test signed off by installer

  • 2.3 All construction changes approved in writing by the designer and marked up on plans?

  • 2.4 Shallow conduit depths marked up on As Cons?

  • 2.5 Earth electrode location marked on all plans?

  • 2.6 Location of earth electrode?

  • 2.7 Ducting and pits completed as per plan?

  • 2.8 Signals hardware completed as per plan?

  • 2.9 Loops installation, location and connections as per plan?

  • 2.10 Pole /post alignments as per plan?

  • 2.11 Conduit road crossings as per plan?

  • 2.12 Line marking as per plan?

  • 2.13 Existing pits and hardware accurately identified on plans?

  • 2.14 All documents are current IMS versions?

  • 3. Electrical Compliance?

  • 3.1 Were mains upgraded? Note size here.

  • 3.2 Earth electrode is installed and complies with BSD 4035 and applicable version of AS/NZS:3000?

  • 3.3 Main earthing conductor is 6mm2 and a Main Earth label is attached at electrode connection?

  • 3.4 Detailed and signed Certificate of Test for controller modifications affixed to door?

  • 3.5 Multicore terminations verified at controller and posts?

  • 3.6 Field wiring is loomed inside controller?

  • 3.7 No bare copper exposed at any terminals - AS/NZS:3000?

  • 3.8 Disused cables removed or terminated - AS/NZS:3000?

  • 3.9 Controller "E" block LV terminal is red?

  • 3.10 "Push button before use" sticker affixed to socket outlet in controller?

  • 3.11 Spare cores effectively earthed in controller?

  • 3.12 Controller conduits sealed as per BSD 4035?

  • 3.13 "E" and "C" markers installed as per BSD 4015?

  • 3.14 Conduit depths comply with BSD 4015 (LV) and BSD 4016 (ELV) or have been approved?

  • 3.15 Shallow conduits concrete encased, approvals supplied and shallow conduit markers installed as per BSD 4015?

  • Comments / Other?

Controller

CONTROLLER

  • Controller Type?

  • QTC

  • Installed Modules:-
    Command Module CM3264
    Spare x 2
    Loop Input Module LIM 1616DW
    Signal Group Module x 4 SGM 524
    Spare
    Power Supply Module PSM 100

  • Eclipse

  • Installed Modules:-
    Processor Card CPM-1a
    Spare x 2
    Detector LDM-416
    Lamp Control x 2 LCM-8
    Power Supply Module PSM

  • Tyco PSC3

  • Installed Modules:-
    Processor Plus
    Spare
    Power Supply
    Spare
    Detector PD 212
    Detector PD 216
    Lamp Control

  • Philips PSC Mk2

  • Installed Modules:-
    Processor
    Spare
    Power Supply
    Spare
    Detector PD 212
    Power Interface
    Lamp Control Low Power
    Lamp Supply

  • ATS ATSC4

  • Installed Modules:-
    Power Supply
    4 S.G. O/P PWR TC400-240
    Detector
    Spare R8080
    EIM 16CH TC400-65
    Spare x 2 R8080
    Logic Processor TC400-45

  • Check this box to list installed equipment / connections

  • LCM installed?

  • LCM make and model?

  • Modem make and model?

  • Network Switch make and model?

  • Comms connected to?

  • Linking connected?

  • Connected to SCATS?

  • Bluetooth installed?

  • Details of equipment not listed above

  • 4. Other controller items checked?

  • 4.1 Controller installed and connected to power?

  • 4.2 Connection type?<br>NOTE:- Construction Manager to be urgently advised of unfused supplies.

  • 4.3 Earth Terminal Bridging Link installed and tightened securely? (QTC controllers)

  • 4.4 Controller operation checked on site?

  • 4.5 Vehicle and pedestrian input operation tested?

  • 4.6 Loops numbering in controller complies with BSD 4012 notes 6 & 7?

  • 4.7 Loops drain wires effectively earthed in controller?

  • 4.8 Screed available and matches plan in controller?

  • 4.9 LCB overlay reflects current signal groups?

  • 4.10 ADSL comms surge diverter installed/upgraded?

  • 4.11 Site ID plate fitted?

  • 4.12 Auxiliary power supplies installed for VID and modem?

  • 4.13 Top hat installed and connected?

  • 4.14 Additional circuit breakers installed?

  • 4.15 All LV switchgear accurately labelled?

  • 4.16 Generator panel installed?

  • 4.17 75mm slab installed around controller base as per BSD 4035?

  • 5. Signal and Controller Operation?

  • 5.1 Vehicle lanterns flashed?

  • 5.2 Vehicle lanterns run?

  • 5.3 Ped lanterns / countdown timers flashed?

  • 5.4 Ped lanterns / countdown timers run?

  • 5.5 Countdown timer numbers all light up correctly?

  • 5.6 P/B inputs checked?

  • 5.7 P/B inputs driving correct group?

  • 5.8 Loop detectors checked?

  • 5.9 Loop inputs checked?

  • 5.10 Loop inputs driving correct group?

  • 5.11 A/T relay operational?

  • 5.12 A/T operation checked?

  • 5.13 Linking communicating?

  • Comments / Other?

Hardware Installation

HARDWARE INSTALLATION

  • 6. Posts / poles / footings checked?

  • 6.1 Post mountings and footings as per BSD 4151?

  • 6.2 Median posts fitted with reflective tape as per BSD 4151 and CRU requirements?

  • 6.3 Joint Use pole specification as per BSD 4123?

  • 6.4 Mast arm specification as per BSD 4124?<br>NOTE:- 6.5m is DTMR type.

  • 6.5 Rate 2 earthing as per BSD 4123, 4124 & Energex PLCM page 1-2-833?

  • 6.6 Joint Use poles numbered to Energex requirements?

  • 6.7 Two sources of supply stickers affixed to JU poles as per BSD 4121?

  • 6.8 JU pole signal junction boxes as per BSD 4102?

  • 6.9 Post multicore terminations as per BSD 4101 (finial) 4102 (J-box)?

  • 6.10 Post multicore terminations verified?

  • 6.11 Redundant holes in posts, outreaches and enclosures plugged to AS/NZS:3000?

  • 7. Lanterns / peds / pushbuttons checked?

  • 7.1 Brand(s) of lanterns on site?

  • 7.2 Ground lantern sight board material?

  • 7.3 Vehicle lanterns mounted as per BSD 4121?

  • 7.4 Quick disconnect lamp isolation installed for new / replacement lanterns / peds?

  • 7.5 Countdown timers installed at correct height as per BSD 4122?

  • 7.6 Lantern locking washers installed as per BSD 4107 for new / replacement lanterns / peds?

  • 7.7 Vehicle lanterns aligned to appropriate traffic lanes?

  • 7.8 Vehicle lanterns visible?

  • 7.9 Vehicle lantern cowls (visors) as per plan?

  • 7.10 Lantern doors fully closed?

  • 7.11 Ped lanterns and push buttons as per plan?

  • 7.12 Ped lantern and push button mounting and positioning as per BSD 4122?

  • 7.13 Ped lanterns aligned to centre of associated crossings?

  • 7.14 Ped lanterns visible?

  • 7.15 Ped lantern doors fully closed?

  • 7.16 Push button alignment as per BSD 4122?

  • 7.17 A/T driver mounting and positioning as per BSD 4122 (post) 4121 (JU)?

  • 7.18 Ped/cyclist stickers affixed as per BSD 4122?

  • 7.19 All cabling effectively secured to post?

  • 7.20 Finial retaining straps firmly attached to finial cap?

  • Comments / Other?

Civil

CIVIL

  • 8. Pits and Conduits?

  • 8.1 Pit lids compliant with BSD 1012 & 4034 and fitted correctly?

  • 8.2 Pit lids show correct designation and BCC logo or lettering?

  • 8.3 Pits and pit lids not damaged or a trip hazard?

  • 9. Posts, Poles?

  • 9.1 Poles and foundations comply with relevant standard drawings?

  • 9.2 Pole bases grouted as per BSD 4121 (JU) or BSD 4151 (post)?

  • 9.3 Post setback as per BSD 4151 (pedestal) or 4122 (short post)?

  • 9.4 JU pole setback as per Energex Public Lighting Construction Manual?

  • 10. Loops?

  • 10.1 Loop terminations tight?

  • 10.2 Loop saw cut entry as per BSD 4011?

  • 10.3 Loops cut and sealed as per BSD 4012?

  • 10.4 Loop lead-ins jointed and numbered as per BSD 4012 notes 6 & 7?

  • 11. Footpath, Kerb, Roadway Checks?

  • 11.1 Kerb ramps installed as per BSD 5233 including tactile ground surface indicators?

  • 11.2 Landscaping completed

  • 11.3 Linemarking completed?

  • 11.4 Footpaths, roadway and kerbs reinstated?

  • 11.5 Intersection left clean and tidy?

  • Comments / Other?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.