Information
-
Address
-
B no:
-
Work Order:
-
Conducted on
-
Location
-
Auditor
Controller
-
Controller Type
- QTC
- EC1
- ATSC4
- PSC
-
Picture of Controller
-
Controller Painted
-
Consumer mains type and condition
-
Point of Supply
-
Main Earth Type
-
Picture of Main Earth
-
Controller RCD Outlet Operational?
-
RCD Test Results @ 0 degrees (30mA)
-
RCD Test Results @ 180 degress (30mA)
-
Accurate As Con plan available in controller
-
Multicore terminations tight - Inc E2 Coloured Red
-
Loops installed and connected to plan
-
VID panel installed
-
Loop terminations tight
-
Screed available and matches plan
-
LCB overlay reflects signal groups
-
Spare cores earthed
-
A/T relay connected - *Note* A/T's are 24hr now
-
Controller Conduits Sealed
-
Site ID Sticker Affixed to Controller
Hardware installation
-
Lantern Brand
- ATS
- AEI
- OTHER
- Braum
-
Lamp Type
- LED
- ELV
- LED - 240v
- LED - Central Light Source
-
Finial and/or Fischer Box Condition
-
Redundant holes in posts and enclosures plugged - AS/NZS:3000
-
Vehicle lanterns aligned to associated traffic lanes
-
Vehicle lanterns visible
-
Vehicle lantern cowls as per construction plan
-
Vehicle lantern cabling secured
-
Lantern doors closed
-
Ped lanterns aligned to associated crossings
-
Ped lanterns visible
-
Ped lantern cabling secured
-
Ped lantern doors closed
-
Are PCT Lanterns Installed?
-
A/T driver mounting to BSD-4121
-
A/T cabling secured
-
P/B mounting to BSD-4122
-
P/B alignment to BSD-4122
-
Ped/Cyclist stickers affixed to BSD-4121/4122
Signal Operation
-
Signals hardware installed to plan
-
P/B inputs checked
-
P/B inputs driving correct group
-
Loop detectors checked
-
Loop inputs checked
-
A/T operation checked
Communications
-
Connection Type
- Optus DSL
- Optus 3G
- BCC ADSL
- Fibre
- RF Link
- Direct Link to MUX
-
Top hat Installed
- Large
- Small
- N/A
-
Communications
-
Switch installed
-
TiC Installed / LCM Installed
-
Bluetooth Installed & Operating
-
Communications surge diverter installed
Hardware audit
-
Post 1 Condition
-
Post 2 Condition
-
Post 3 Condition
-
Post 4 Condition
-
Post 5 Condition
-
Post 6 Condition
-
Post 7 Condition
-
Post 8 Condition
-
Post 9 Condition
-
Post 10 Condition
-
Post 11 Condition
-
Post 12 Condition
-
Post 13 Condition
-
Post 14 Condition
-
Post 15 Condition
-
Post 16 Condition
Civil
-
Pit lids compliant and fitted correctly
-
Pit Condition
Sign Off
-
Comment works carried out while Performing Audit
-
Follow up Works Required
-
Auditor signature
-