Title Page
-
Site conducted
-
Project Number
-
Conducted on
-
Prepared by
-
Location
-
Site Manager
-
Site Supervisor
People
-
Supervision Competent?
-
Contractor PM/Supervisor has CITB 5 day SMSTS or Equivalent? Suitable and Experienced for nature of works undertaken? Understanding of SHEW CoP? Approved environmental awareness training?
-
Competent Site Personnel?
-
In date CSCS/CPCS card appropriate to the role OR a suitable equivalent? Task specific/appropriate specialist training eg abrasive wheel, tower scaffold, CAT etc?
-
Effective Supervision?
-
Clear and appropriate structure? Sub Con supervision? Application of site rules and appropriate standards? Adequate resource?
-
Knowledge and understanding of EA standards applicable to the Project?
-
SHEW CoP, Timber, Diversity etc
-
Sub contractor arrangements/controls.
-
Has the site got a suitable process for selecting and managing sub-contractors? Are subcontractors adequately managed?
-
Induction Training and Worker Engagement
-
Has induction training taken place and does it cover site specific rules and risks including the environment risks and invasive/protected species locations?
Process
-
Tree works assessments?
-
Embankment stability assesments?
-
Pre-works walkovers?
-
Design Risk Assessment?
-
Maintenance standards?
-
Assessment maintenance schedule?
-
PCI provided?
-
Risk assessments suitable and sufficient?
-
Risks properly identified and rated? Control measures are appropriate? Risk-Control measure are in place and adheared to?
-
Method statements
-
Available for all relevant tasks and use language and style appropriate for the people who are going to use them? Site specific? Methods can be followed? Agreed methods (MS) are known by operatives and being consistently complied with? Changes to methods understood and complied with?
-
Emergency arrangements suitable (including environment)
-
Arrangements for recovering people and equipment? First aider(s)? Local hospitals and arrangements for giving access for emergency vehicles? Spill kits including training? Also consider silt and grout where these risks exists? Bio-security? Water rescue? Rope rescue? MEWP rescue? CoSHH? Lone working? Management of invasive species?
-
Permit to work systems followed and managed?
-
Toolbox talks?
-
Safety and environment? Site specific and at regular occasions?
-
Site self monitoring arrangements adequate?
-
Active monitoring? First tier assurance? Evidence actions are completed agreed timescales? Frequency of monitoring is adequate?
-
Statutory/Special inspections
-
Plant and Equipment PUWER? LOLER? Scaffold? Excavation? Pressure Systems? Evidence actions are completed agreed timescales?
-
Company safety inspections
-
SHEW CoP requirement for notifiable works over 30 days. Evidence actions are completed agreed timescales? Site/activity is regularly visited by suppliers h&s lead? Safety inspections are taking place? Actions are recorded and closed in timely manner?
-
Accident/near miss reporting arrangements
-
Logging of complaints? Clear arrangements to report? Follow up? Corrective actions? Reporting to client or regulator? SHEW CoP requirements met?
Place
-
Housekeeping and Security
-
Tidy site, well organised with no trip hazards? Members of the public are kept out of works area? Out of hour restricted access? Double clipped heras fencing? Traffic routes? Barriers? Segregations? Integrity of fencing?
-
Site signage
-
Appropriate signage for public, site staff etc
-
Overhead and burried services managed adequately?
-
Service drawings reviewed? Services identified and marked out? Working in accordance with GS6? Goal posts in place? Plant weights considered? Exclusion zones? Height limiter fitted to plant? Risk Assessment and SSOW? Permit? Current service drawing? (<90days), CAT (with data logging function) and Signal Generator? PAS128 applied? GRP survey done as per SHEW CoP? Compliance with LIT 11681 Safe working Near Underground Services OI?
-
Traffic Management (on/off site) including plant deliveries and movements.
-
Traffic management should avoid the need for reversing, or reversing with banksman and keep pedestrians plant and cars separated where ever possible. Traffic management supervised by a competent person, Equipment used to be in a good condition. People plant interfaces. Traffic management in place for plant deliveries when required (Chapter 8), plant deliveries planned correctly, suitable haulage vehicles used, competence of operatives involved.
-
Storage areas suitable?
-
Welfare facilities adequate?
-
Compliance with SHEW CoP requirements? Adequate for tasks and numbers on site?
-
First aid equipment
-
Readily available at the place of work? Correct first aid available for chainsaw works? (large wound dressing/celox pads/eye wash etc.) First aider present and trained to correct level - EFAW/FAW?
Plant and Equipment
-
Suitable - plant selection?
-
Right item, including attachments being used for the task in hand? Size, weight, height, attachments. Remote control equipment considered and used when possible? CE certified plant? Bio-degrable hydraulic fluid? Compliance with PUWER? All round vision? Pre use checks? Weekly recorded inspections? Seat restraints? Hydaulic isolation when seat belt is not in use? Fit for purpose? Proximity sensors? Beacons?
-
Condition/Records/vision/cameras/beacons Electrical leads, supplies etc safe?
-
Visual Inspection for damage? Plant including attachments and lifting gear routinely inspected by competent persons and defects dealt with appropriately? Vision particularly around slewing plant such as excavators is normally 360 degs and that all devices are in good condition and properly adjusted? PAT in date for portable tools and equipment? Leads in good condition and fixed circuits in cabins etc checked at least during site establishment?
-
HAVS - WBV
-
Monitoring? Recording? Tagged tools? (vibration magnitude/trigger times), Training? Awareness? Limited time working etc...
-
Plant storage & location, storage of fuels, oils and greases.
-
Plant not parked near sensitive receptors (drains/watercourse)? Oils and fuels not stored in cabs or engine compartments? Petrol? Driven plant and equipment placed or parked on spill trays?
-
Used correctly - in accordance with training and manufacturer instructions? Secured keys?
-
Operators manual is present and readily available? Proper attention is applied to the safe use of the equipment in particular use of safety belts? No reversing without looking behind? Not traversing slopes at an angle or otherwise in a dangerous position? Engines switched off and keys are removed when the operator is not in the cab?
-
People/Plant/Public arrangements
-
Written arrangements in place, application and following of the safe system of work? Public safety - segregation/barriers signage? Public kept out of works, adequate segregation of the work?
-
Banksman trained - utilised correctly inc. vehicle marshalling ?
-
For banking vehicles NOTE, not the same as a slinger signaller.
-
Spill Kits available / adequate re-fuelling arrangements?
-
Near key risk areas, i.e. refuelling point, remote sites, or operating plant etc? Should also be well stocked with gauntlets, goggles and bag for dealing with any used spill material? Fuel stored in correct containers which are either bunded or placed on bunds? Quantities of fuel / oil carried do not exceed legal allowance? Operative carrying fuel bowsers have correct qualifications? (hazmat training)
Product/Health
-
Display and use of key documentation
-
F10? SHEW CoP? H & S Law poster? Updates to RAMs? Accident/incident reporting poster? Insurances? WCL? Policies? Safety Alerts?
-
Occ Health specialist available?
-
Organisation arrangements in place so that access to occupational health for surveillance and referral for work related issues?
-
Health surveillance?
-
Individual health-Health checks which include audiometry, spirometry, HAVs assessment? Are all operatives having health surveilance?
-
Occupational hygiene assessment
-
Workplace-Hygiene risk controls in place? Noise assessments? Vibration assessment? Dust monitoring? Control measures identified and remedial measures in place? Trigger times? PPE?
-
RPE Face fit testing
-
Face fit testing, done by qualified persons?
-
Health Promotion
-
Active management of issues on site? Awareness of EAP? EAP Cards?
Specific Safety Areas
-
PPE arrangements
-
Use of correct PPE? In date? Well looked after and managed?
-
Fire Safety
-
FRA? Fire extinguishers commissioned and serviced? Fire wardens? Signage i.e. exit routes? Fire equipment type? Muster point? Flammable materials storage? Fire drills undertaken? Training?
-
Excavations
-
Risk Assessment and SSOW? TW arrangements? Guarded? Shoring? Battering? Demarcation,? Edge protection? Signage?
-
Work at height
-
Stairs/ladders, access leading edges etc? RA and SSoW? Competent workers? Clear roles and responsibilities? Segregation from MOP? Aerial tree work control measures? MEWPS? Use of chainsaws? PPE? Emergency rescue?
-
Electrical Safety
-
PAT? 110 volt? Statutory inspection? Fixed installations? Condition of equipment and cables?
-
Confined space
-
Risk Assessment and SSOW? Permit? Training? Competence? Health checks? Face fit tested? Supervision? Classification? Equipment? Emergency arrangements? Evacuation plan?
-
Manual Handling
-
Task Individual Load Environment? Risk assessment and SSOW include Manual Handling control mesaures?
-
Hazardous Substances
-
COSHH assessments? RPE? Storage? Suitability of the PPE to the substance handled? Face fit testing? Materials in use appropriate?Appropriate selection and use of materials considering health issues?
-
Hot work
-
Permit arrangements? Supervision? Cooling off period?
-
Noise
-
Monitoring? Silencers? Dampers? PPE?
-
Lifting and winching operations
-
Lift Plans? Competency? (AP, LS, SS etc) Exclusion zones? Current lifting equipment and accessories certification? Weekly checks?
-
Work in or near water
-
Risk Assessment and SSOW? "shout/reach/throw" principles followed? Training? Competency? Life jackets? Buoyancy aids? Throw bags? Rescue line? Effective emergency arrangements? Weather checks? Weekly checks on equipment?
-
Environmental Controls
-
Plant nappies or spill trays in place? Silt management plan and mitigation implimented? Emergency arrangements to cover all foreseeable risks? Concrete and grout risks identified and controlled? Other risks being managed? Compliance with EA timber requirements? - (FSC / PEFC / Coppice (permissions).
-
Temporary works
-
TW process and procedures being followed? Competent TWD/TWC appointed? TW Register in place and current? TW correctly categorised? TW design briefs and justifications completed? Permits to load and strike in place? Scaffold handover certificates present? Statutory TW inspections undetaken? TW supervision? Consent? Construction revision drawings in place?
-
Floating plant/cranes
-
Compatibility? Suitability? Stability? De-rating?
-
Plant working next to water
-
Machine mats? Safe system of work? Ground stability/conditions? Control zone?
-
Invasive none native species
-
INNS being managed correctly? Segregated and signed? Site specific Bio security plan and bio-security kit in place as per SHEW CoP? TBTs and information provided?
-
Protected habitats
-
Protected habitat disruption? Disturbance? Destruction? Ecology risks identified and managed? Evidence of relevant TBT's and comms to staff members?
-
Waste management
-
Correct exemption for waste activities? Management of waste? Waste stored appropriately? Lidded skip for general waste? Separate hazardous waste bin for used spill kits? Correct waste in correct skip? Checks on carriers and destinations?
Sign Off
-
Name of Auditor
-
Sign