Title Page

  • Site conducted

  • Incident severity level: MEDIUM

  • Consequences of incident: Loss of the ability to operate the lighting system.

  • Area of building: Whole Building

  • What is affected?
    Revenue and Quality of visit

  • Who is affected?
    Staff, Customers and Touring Companies

  • Relevant contacts:
    Technical Team
    MEM Services Ltd - Local Electrical Contractor 01895 672807
    Planned Preventative Maintenance Contractor.

  • Date

Initial response

Troubleshoot the situation.

  • Have you followed the 'Lighting Bible' (which can be found I the lighting booth) to troubleshoot any potential issues?

  • If possible discuss with the technical team any other solutions to the issue.
    Bronze to inform Silver of the issue and contact any required contractor.
    Bronze to begin completing Check Sheet 1.

Check Sheet 1

  • What time was the lighting issue discovered?

  • What are the details of the issue?

  • What time was an external contractor contacted?

  • Estimated time of response.

  • What information was given?

  • Will the issue affect performances or the building operation?

  • Bronze to update Silver on estimated response. Silver will make further decisions regarding the building operations.

  • Are immediate performances being cancelled?

  • What plan is in place to continue?

Outcome

  • What was the issue affecting the lighting system?

  • How long did it take the issue to be resolved?

  • Which contractor was used?

  • Date

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.