Information
-
Location.
-
First line of the Address.
-
Type of Survey
-
Client Name.
-
Tenure.
- Owner occupier
- Local Authority
- Housing Association
- Privately Rented
- Eco measure
-
Survey conducted by.
-
Conducted on
Dynamic Risk Assessment
Access Assessment
-
Do you give consent for us to carry out works within your property ?
-
Reasoning?
-
Is there an overhead main power cable to the property that needs sheathing before scaffold erected?
-
Photographic Evidence
-
Are there any conservatories or out buildings that require a scaffold bridge for this job?
-
Are there any restrictions to the property i.e. Low bridge, neighbours access required ?
-
Comments
-
Photographic evidence
-
Is the property location a main pedestrian route and/or a public walkway ?
-
Comments
-
Photographic evidence
-
Is parking available, adequate for the size of vehicle and close to the property ?
-
Comments,
-
Photographic evidence
-
Do parking restrictions exist i.e. Residents parking ?
-
Comments
-
Photographic evidence
-
Will the proposed works affect neighbouring properties ?
-
Comments
-
Photographic evidence
-
Has the neighbouring property been notified of the imminent works?
-
Date of notification given-
Occupant Assessment
-
Is the property in a suitable condition for the proposed works to be carried out ?
-
Comments
-
Photographic evidence
-
Is the property highlighted as flagged or at risk ?
-
Comments
-
Do the occupants have any physical disabilities that pose any significant risks ?
-
Comments
-
Do the occupants have any learning difficulties where our activities may pose any significant risks ?
-
Comments
-
Are there any potential risks regarding minors in the property ?
-
Comments
-
Are there any potential risks regarding pets in the property ?
-
Comments
-
Is there any presence of protected species (e.g., bats, birds butterflies, dormice) or plants that could be subject to special protection ?
-
Is the property high risk of biological waste or vermin ?
-
Comments
-
Photographic evidence
-
Is the property at high risk of hypodermic needles ?
-
Comments
Asbestos Assessment
-
Are we in receipt of or have access to the asbestos survey or register for this property ?
-
Asbestos Assessment Needs to be Checked
-
Comments
-
Has asbestos been identified ?
-
Comments
-
Photographic evidence
Building & Heating Information:
-
Construction age of the building.
-
Property Type.
- Mid-Terrace
- End terrace
- Semi-detached
- Detached
- Ground Floor Flat
- Middle Floor Flat
- Top Floor Flat
- Masonette
- Bungalow
- House
- Commercial Building
-
Number of Bedrooms.
- 1
- 2
- 3
- 4
- 5+
- N/A Commercial
-
Floor Construction Type
- Solid
- Suspended
- Suspended not wood
- Other
-
Please take a photo of the Electric and Gas meters where applicable.
-
Main Heating type, plus take a photo of the appliance ID and rating plate.
-
Photo of appliance name/make/model/rating plate.
-
Location of the flue, please take a photo.
-
Secondary heat source, please take a photo.
-
Secondary Heat source type.
- Gas Fire with Flue
- Gas Fire with chimney
- Gas Fire Flush Fitted
- Open Fire with internal chimney
- Open Fire with external chimney
- Wood Burner
- No other heating present
-
Location of Combustion vent if present.
-
Have you done an internal inspection of the building? If yes please take photos of your findings.
-
If you have answered yes please select the best description of your findings.
- Low level damp near the skirting boards
- Black mould in the corners of the rooms
- Black mould on the ceiling and the walls
- Condensation on the windows and external walls
- No internal issues that I can see.
-
Points to Consider
-
Use of a Step ladder/ladder
-
Access and Egress
-
Manual Handing
-
Hand Tools/Power Tools
-
Vibration
-
Noise
-
Dust
-
House Keeping
-
Lone Working
-
I have assessed the condition on site ensuring there is adequate ventilation and no evidence of damp and no remedial works required. Unless listed below,there are no additional significant hazards observed that are not addressed in the generic risk assessment for the work to be undertaken.
-
Please provide details
EEM Specific Survey Information
-
EEM Specific Information Required
-
Will the installation work result in non-compliance with the building regulations in relation to:
-
Workmanship
-
Materials
-
Structural Stability
-
Fire Safety
-
Resistance to Moisture
-
Will the proposed installation result in any avoidable thermal bridging
-
Will the proposed installation result in unsafe operation of combustion appliances
-
Will the proposed installation compromise the functionality of existing ventilation ducts/systems
-
Will the proposed installation compromise the functionality and/or safety of existing services (gas, electric, water, telephone, etc.)
-
Will the proposed installation be non-compliant with any requirements stated by the supplier
-
Is the condition of the substrate suitable for the works to commence
-
Have relevant checks been undertaken to determine if asbestos containing materials are present
-
Is the nature and extent of the survey known to the customer and is it in line with their expectations
-
Are the arrangements made for site access and installation materials storage adequate and appropriate for the installation to be undertaken
Loft Insulation.
Loft Insulation Survey
-
Is Loft Insulation a Required Measure?
-
Is the Loft Accessible?
-
Is loft to be insulated.
- Yes loft requires topping up
- No Loft has sufficient insulation
- Unable to check due to the amount of tenants belongings.
-
Photo of loft and access point
-
Loft Hatch Size?
-
Loft hatch needing D/P
-
Does the hatch need to be replaced?
-
Area to be insulated.
-
Photo of existing depth.
-
Existing Depth.
- 0mm
- 12mm
- 25mm
- 50mm
- 70mm
- 80mm
- 100mm
- 125mm
- 150mm
- 170mm
- 200mm
- 250mm
- 270mm
- 300mm plus
-
Minimum Depth to be achieved
- 270mm
- 300mm
- 350mm
- 400mm
- Other
-
Pipes Present
-
Details of pipes
-
Number and length of pipes to be lagged
-
Check on site
-
Tanks Present
-
Details of tanks
-
Do the tanks require insulating
-
Check on site
-
Down lights present in ceiling?
-
Details of down lights, how many and there current location
-
Do they have halogen bulbs fitted.
-
Can you see the IP rating on the casing?
-
Please take a photo of the down light IP rating.
-
Are there any existing down light covers fitted?
-
If YES are they fire rated covers?
-
Electrical wiring free from visual defects?
-
Any evidence of electric wiring trapped between insulation?
-
Are there any high voltage cable's in the loft space.
-
If YES please select the type of cable in the loft space.
- Cooker cable
- Shower cable
- Immersion cable
- PV cable
- Other
-
In your opinion should loft be Rolled or Blown?
-
Loft Height at Centre
- 0.80 metres
- 0.90 metres
- 1.00 metres
- 1.20 metres
- 1.40 metres
- 1.50 metres
- 1.60 metres
- 1.80 metres and above.
-
Does a steel combustion flue pass through the loft space?
-
Relay of Insulation Required?
-
Estimate of relaying time allocation
-
Loft vents required
-
Cross Flow Ventilation
-
Areas to be omitted
-
What Areas?
-
Does the loft have any boarding?
-
If YES can we insulate at lease 2/3 of the loft space?
-
Has the boarded area got insulation under it?
-
If not insulated under, are the joist tunnels tightly sealed with insulation at the ends?
-
Is roof eaves insulation present
-
Can the insulation be undertaken through the loft space
-
How should it be installed?
-
Rafter depth (mm)
-
What is the roof covering?
- Clay
- Concrete
- Slate
- Interlocking
- Lapped
- Unknown
-
Breathable felt fitted?
-
Is the specification available?
-
Walkway required
-
Details of walkway
- Required to access all areas
- Access to heat pump equipment
- Access to inverter
- Access to hot water cylinder
- Other
-
What is Required?
-
Loft clearance
-
Details of loft clearance
-
Estimate of loft clearance time allocation
-
Remedial works required for Loft, If yes please give details of remedial work plus photos.
-
If yes have you got the owner/tenant to sign a remediation form?
-
Why?
- No Hatch
- Hatch Blocked
- Hatch Over Stairs (Cannot Access Safely)
- Resident Refused Access
- Other
-
What?
-
Safety monitors present.
- Smoke Alarm
- Fire Alarm
- CO2 Alarm
-
Are they working
Sign Off
Assessment Sign off
-
Surveyors Signature and Full name