Information
-
Document No.
-
Site Engineering Number and Name
-
Location
-
Conducted on
-
Prepared by
NRM Data Update
BMR Presence
-
Is the BMR Public Safety box checked if the site has a BMR impact?
-
Are BMR Services datafilled in the comments box?
On-Call
-
Is the appropriate on-call rotation selected?
Site Technician
-
Is there a Primary Site Technician assigned?
-
Are appropriate Back-Up Technicians assigned (at least one for Northern sites and at least two for Southern sites)?
Site Access Requirements
-
Are all remote rooms/closets identified with accurate access info?
-
Are all of the site access requirements understood and documented?
-
Is the site contact information (i.e. Landlord) valid and up-to-date?
-
Notes regarding NRM Updates:
Power and Alarm Verifications
General Alarming
-
Have all alarm points been transferred to the LTE BBU?
-
Has the CAM/ECM alarming been cutover to the<br>BBU?
-
Are all other site specific and miscellaneous alarms functional?
AC Power Failure Alarm
-
Does alarm point 65035 trigger when the site,'s AC power is turned off?
-
Is the AC power failure alarm wired correctly on the hydro side of the transfer switch?
-
Has the AC power failure alarm been tested and verified as functional in the storm management tool?
Door Alarm
-
Does alarm point 65033 trigger and extinguish with the door open and closed as expected?
Alpha/Argus Power Plant
-
Is the power plant software current?
-
Is the power plant visible in Adept and on Netracs?
-
Does alarm point 65037 trigger and extinguish when each of the battery breakers are tripped as expected?
Smoke Alarm
-
Do alarm points 65038 and 65039 trigger when the smoke alarm is enabled?
Tower Light Alarming
-
Does alarm point 65034 trigger when the DC breaker feeding the Tower Light box is tripped??
-
Does alarm point 65036 Tower Light MIN trigger when either connector J1 and-or J2 in the tower light box is disconnected?
RRU Power Lead Verification
-
Are the DC power connections for the RRUs at the terminal block in the external connect cabinet tight?
Remote PM Checks
-
Has an annual remote check and validation of microwave alarms been performed (look for early warning signs to prevent outages)?
-
Has an annual remote check of light levels for each RRU been performed (look for early warnings signs to prevent outages)?
-
Notes regarding power and alarm verifications:
External Site Inspection
Grounding
-
Is grounding for antenna feedlines present and securely bonded at the external entry point?
-
Is there grounding for the building, tower, ice bridge and fence and is it securely bonded?
-
Building ground reading (ohms):
-
Tower ground reading (ohms):
-
Battery cabinet ground reading if applicable (ohms):
General Exterior
-
Is the site compound free of damage and/or debris and have any urgent deficiencies been identified to both the MCM Team and your Manager?
-
Is the compound free of major vegetation issues (trees, brush and weeds etc.) and have any urgent needs been identified to both the MCM Team and your Manager?
-
Has the access road been inspected and any repairs required been identified to the MCM Team and your Manager?
-
Has the external lighting been validated as working and is it free of deficiencies?
-
Has the tower been visually inspected and is it free of deficiencies?
-
Has the tower lighting been validated as working and is it free of deficiencies?
-
Are the tower light interconnect boxes at the base of the tower correctly oriented so the weep hole face th ground?
-
Has the building been inspected and is the building free of deficiencies?
-
Has the external cabling been inspected and is it free of deficiencies?
-
Are external warning signs secured and visible?
-
Is the generator spigot clean, free of damage and easy to open?
-
Has the fixed generator on-site been visually inspected for leaks and damage? Report any spills to the Bell Enviroline, the MCM Team and your Manager.
-
Is there a spill kit and absorball on-site?
-
Are gates, padlocks and door locks present, locked with the correct combination(s) and in proper working order?
-
Is the compound fencing secure with the top barbed-wire string intact?
-
Pictures of the external site and any deficiencies identified:
-
Additional comments regarding the exterior conditions of the sie:
Internal Inspection
Internal Grounding
-
Are equipment racks, cable entry and single point grounds present and securely bonded?
General Interior
-
Is the internal site sign present and posted with the Site Technician's name, the WNOC's telephone number and site 911 address?
-
Are the heating, air conditioning and/or free-cooling unit(s) functional and in proper working order?
-
Ambient temperature (degrees C):
-
Is the interior floor free of debris and/or garbage?
-
Is the site free of any evidence of water leaks, pests, rodents, and/or insects? Have the entry ports been sealed properly?
-
Are the site batteries free of any evidence of corrosion, leaks and/or cracks?
-
Has the fire extinguisher charge been verified and is there a current inspection date (within the last year)?
-
Has the floor plan and/or rack profile been updated with the Equipment Engineering prime for the Zone (Applicable ONLY if something has changed since the last inspection/update to Equipment Engineering)?
-
Is the transfer switch and main disconnect functional and in proper working order?
Air Filters
-
Has the Dantherm filter been inspected, cleaned and/or replaced?
Equipment Labeling
-
Is labeling correct and in place for microwave equipment, routers, switches, muxes, DSX panels and T:LAN etc.?
-
Is labeling correct and in place for the power plant, fuses, breakers and distribution panels?
-
Is labeling in place and correct for BIX fields and alarming?
-
Is labeling in place and correct for HSPA and LTE equipment?
-
Is labeling in place and correct for antenna lines and connectors?
Miscellaneous
-
Pictures of the interior site and any deficiencies identified:
-
Additional comments regarding interior site conditions:
Routine Inspection Sign-Off
-
The final audit is to be exported in .pdf format and is to be uploaded to the site folder in FMLS. Any and all deficiencies are to be addressed by the Site Technician and/or reported to your Manager where applicable
-
Add signature