Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
I understand that I am responsible for securing the building and that i will physically complete all tasks and items on this list.
-
Have you completed your Eos (End of Shift) Checklist prior to leaving the building?
-
Please go back and Complete your EoS Checklist prior to completing your close process.
-
I have signed out of Mindbody on all PCs and iPads
-
I have confirmed that all iPads left in the office are either charged > 80% or on charge ready for tomorrow.
-
I have physically and VISUALLY confirmed that all Air Conditioning units in the studio have been switched off
-
The following Air Conditioning unit have been confirmed as switched OFF:
- Main Unit - Reception
- Main Unit - Studio
- Rear Studio Unit
- Font Admin Office
- Front Consult Room 1
- Rear Consult Room 2
- Group Fitness Room FANS
-
I have brought all flags and A-frames inside and set them to be visible in the front windows
-
I Have physically inspected all EIGHT doors and confirmed they are CLOSED and LOCKED. (5 rear, 3 front)
-
I have switched off all lights and Fans in the building, including the Kitchen light and confirmed they are OFF.
-
I have set the font door to LOCKED and confirmed/tested that the door will NOT open without a key.
-
I have my Car keys and Studio Keys (and all belongings) in my hand prior to walking out and locking the door behind me
-
AWESOME work today, thanks so much for your efforts.
Have a great day