Information
-
Location
-
Conducted on
-
Prepared by
-
Personnel involved
EXITS
-
Are egress routes and exits clear & unobstructed? If YES, skip to next category.
-
If exits are obstructed, have alternate exits been established?
-
If alternate exits have been established, are personnel in the area informed and aware of their relocation and existence?
-
Are all exits clearly identified and visible in the event of an emergency?
-
Are evacuation routes posted?
EDUCATION/TRAINING
-
Are written procedures and guidelines posted in the immediate area for what to do and who to call in the event of a fire or emergency?
-
Are personnel in the immediate area aware and informed regarding procedures to follow in the event of fire of emergency?
FIRE ALARM, DETECTION AND SUPPRESSION FEATURES
-
Is the fire alarm system operational?
-
Is the fire sprinkler system operational?
-
If the existing fire alarm or sprinkler system is impaired, have measures been taken to provide equivalent systems for adequate protection?
-
Are the temporary fire alarm or sprinkler systems being inspected and tested monthly?
-
Are personnel in the area aware and informed on how to use the temporary fire alarm and or sprinkler system?
COMPARTMENTATION FEATURES
-
Are there unprotected penetrations and/or openings in any smoke or fire barrier?
-
Are there any door latching problems?
-
Are self closing devices operational?
-
Are fire and/or smoke dampers operational?
MISCELLANEOUS
-
Are temporary construction partitions smoke tight and non combustible?
-
Are storage, waste and debris areas being maintained to minimize potential for fire or safety hazards?
-
Are portable fire extingquishers (fully charged w/ current inspection stickers) readily available?
-
If there is hot work, do workers have hot work permit?
-
Do electrical panels, temporary wiring, extension cords, tools and equipment appear to be installed, utilized and functioning in a safe manner?
-
In general, are the construction site, building and grounds free of hazards and potential safety violations?
-
Are hand and safety rails in place and maintained in good condition?
-
Are SDS readily available for any hazardous chemicals that are present or being used?
-
Do ladders and scaffolds appear to be in satisfactory condition and used in a safe manner?
-
If required, is personal protective equipment (PPE) being used?
-
If electrical equipment needs to be deenergized, are applicable lockout/tagout procedures being followed?
-
Additional Comments