Title Page
-
Conducted on
-
Prepared by
-
Location
Weather Assessment
-
Empty pockets and remove all loose objects that may pose a fall risk (eg. Hats, Glasses, Keys, Passes, Phones, Jewellery, Drink Bottles, Coffee Cups, etc.)
-
Is there a live edge present?
-
It is now safe to proceed and assess the weather
BMU Inductons
-
All operators have been inducted in the safe operation of the BMU and specific site notes
-
Conduct a BMU induction
-
Upload a photo of completed induction and register
-
Proceed to BMU pre-inspection
BMU Pre-Inspection
-
Conduct the BMU Pre-Inspection as per the SWMS and site-specific checklists
-
Fault/s identified?
-
Do Not Proceed. Contact Briteway Management
-
Upload a photo of the completed pre-inspection
-
Proceed to BMU Kit and Tether Setup
BMU Kit and Tether Set Up
-
Are all items in the kit free of damage and safe for use?
-
Do NOT Proceed. Contact Briteway Management.
-
BMU has been set up with appropriate tethers and restraints and is now deemed as safe to operate
-
Proceed to BMU SWMS step
BMU SWMS
-
Date the Job Overview, Pre Work Hazard and Operational Checklist, and the Risk Assessment Sign off pages
-
Conduct Pre Work Hazard Checks
-
Do NOT Proceed. Contact Briteway Management
-
Undertake Daily Risk Assessment
-
Have there been any risks identified
-
Do any of the risks have a final risk rating of "Moderate" or higher
-
Do NOT Proceed. Contact Briteway Management.
-
Complete the daily risk assessment and verbally address the risks and appropriate control measures with the other staff on-site
-
All staff on-site have signed off on the SWMS
-
Upload a photo of the completed pre-work checks, daily risk assessment and staff sign off
-
Proceed to the final checks
-
"Nil" has been listed in the daily risk assessment
-
All staff on-site have signed off on the SWMS
-
Upload a photo of the completed pre-work checks, daily risk assessment and staff sign off
-
Proceed to the final checks
-
Equip a harness, perform a buddy check and attach to the approved access system
-
It is now safe to proceed and assess the weather
BMU Inductons
-
All operators have been inducted in the safe operation of the BMU and specific site notes
-
Conduct a BMU induction
-
Upload a photo of completed induction and register
-
Proceed to BMU pre-inspection
BMU Pre-Inspection
-
Conduct the BMU Pre-Inspection as per the SWMS and site-specific checklists
-
Fault/s identified?
-
Do Not Proceed. Contact Briteway Management
-
Upload a photo of the completed pre-inspection
-
Proceed to BMU Kit and Tether Setup
BMU Kit and Tether Set Up
-
Are all items in the kit free of damage and safe for use?
-
Do NOT Proceed. Contact Briteway Management.
-
BMU has been set up with appropriate tethers and restraints and is now deemed as safe to operate
-
Proceed to BMU SWMS step
BMU SWMS
-
Date the Job Overview, Pre Work Hazard and Operational Checklist, and the Risk Assessment Sign off pages
-
Conduct Pre Work Hazard Checks
-
Do NOT Proceed. Contact Briteway Management
-
Undertake Daily Risk Assessment
-
Have there been any risks identified
-
Do any of the risks have a final risk rating of "Moderate" or higher
-
Do NOT Proceed. Contact Briteway Management.
-
Complete the daily risk assessment and verbally address the risks and appropriate control measures with the other staff on-site
-
All staff on-site have signed off on the SWMS
-
Upload a photo of the completed pre-work checks, daily risk assessment and staff sign off
-
Proceed to the final checks
-
"Nil" has been listed in the daily risk assessment
-
All staff on-site have signed off on the SWMS
-
Upload a photo of the completed pre-work checks, daily risk assessment and staff sign off
-
Proceed to the final checks
Final Check & Inspection
-
Have all BMU inductions, pre-inspections and SWMS been completed?
-
Is the BMU free from any loose objects, including anything in the cradle which may not belong to Briteway?
-
Are all operators free from any loose items, including anything that may be in their pockets?
-
Has all the equipment been tethered and secured as per training?
-
Has an exclusion zone been set up with appropriate signage where applicable?