Title Page
-
Conducted on
-
Prepared by
-
Location
-
Type of Work:
-
Are General SWMS completed and signed off
-
Have work environment hazards have been signed I.e. wet floor, working overhead etc
-
Staff have been provided with any PPE as required by the SWMS, and are wearing such PPE in the correct manner
-
Access ways and emergency exits near the work area are clear and free from obstruction
-
Are EWP SWMS completed and signed off, including the pre-inspection of the EWP
-
Work environment hazards have been signed I.e. wet floor, working overhead etc
-
Vehicular traffic management controls have been put into place, including barricading, signage and provision of alternate routes as required. Traffic management is in accordance with plan
-
Pedestrian traffic management controls have been put into place, including barricading, signage and provision of alternate routes as required. 1.2m access for pedestrians provided
-
Logbooks have been filled out as required (attach image if possible)
-
Are EWP SWMS completed and signed off, including the pre-inspection of the BMU?
-
Have all BMU inductions been conducted and recorded in site folder for all staff on site?
-
Vehicular traffic management controls have been put into place, including barricading, signage and provision of alternate routes as required. Traffic management is in accordance with plan
-
Pedestrian traffic management controls have been put into place, including barricading, signage and provision of alternate routes as required. 1.2m access for pedestrians provided
-
Are all BMU kits being used as intended and contain all the appropriate equipment?
-
Tools and equipment are tethered off to prevent dropping
-
Required PPE (i.e. harnesses and lanyards) is available and used correctly