Title Page
-
Ferme Park
inc: Accommodation Rooms
Car Park/Access steps
Access Road adjacent to London Concrete
Fuelling Points
Walking Boards
New CET area
Security of Fences
All bunded storage -
Conducted on
-
Prepared by
-
Location
-
Personnel
Car Park/Access steps
-
Gate & perimiter fence secure
-
Car park tidy & free from rubbish/debris
-
Skips/bins in good order
-
Sand bags & pallets safely stored
-
Walkways/stairways in good condition & free from hazards
Walkways & Access Routes
-
In good condition, clearly marked and clear of tripping hazards
-
Free from tripping hazards
-
Clean and clear of litter
-
Lighting in good order
Accommodation/Panel Room
-
Building free from leaks
-
Changing room, lockers and facilities for cleaning, drying and storing clothing in good order
-
Personal Protective Equipment stored appropriately in Locker Rooms
-
Heating/Cooking appliances maintained regularly (Check stickers/paperwork)
-
Walls undamaged
-
Adequate lighting in the area (i.e no bulbs/tubes out)
-
Temperature/ventilation adequate
-
Materials, tools & equipment stored appropriately
-
Fire Exit doors working correctly and not wedged open
-
Furniture in good condition and free from faults
-
Kitchen area clean
Diesel Storage
-
Bund walls free from cracks
-
Bund walls free from vegetation growth
-
Pipework free from leaks
Emergency Arrangements
-
Emergency lighting in good working order (indicator light illuminated)
-
First Aid arrangements poster displayed and up to date
-
First aid kits fully stocked and clearly labelled/accessible
-
First aid items within ‘use by’ date
-
“Break Glass” call points in good working order (casing not broken or cracked etc.)
-
Fire evacuation notice displayed and in date
-
Fire extinguishers in good order and within inspection date (12 months) and signs displayed indicating the type of fire extinguisher
Tools & Equipment
-
Calibrated tool locker - index up to date & corresponding tools available
-
PPE cupboard full stocked
-
All work equipment is in good working order and portable equipment within PAT test date.
-
Machine guarding adequate in place and machine isolators locked off
-
Equipment not in use parked/stored correctly and safely
-
Tools maintained and fit for purpose
-
Manual handling aids used correctly as required
Security
-
All access doors/gates secure and in working order
-
CCTV is in good working order
Materials
-
Hazardous/harmful materials adequately stored/identified/assessed
-
Racking undamaged and fit for purpose
-
Pollution Prevention: Spill kits available where required and sealed
-
Where observed hazardous Substances are used correctly and stored correctly when not in use
Energy and Environment
-
Waste correctly segregated and being disposed of in correct manner
-
Nuisance: Noise, and odour – Noise levels at the site boundary are acceptable. No<br>discernible odours are present at the site boundary.
-
Lights are turned off in rooms not being used
-
Taps are turned off correctly and are free of leaks