Title Page
-
B.O.S Ref No
-
Surveyors Name
-
Surveyor contact number
-
Location
-
Conducted on
-
Is there a vulnerable customer at the address?
-
Any special access instructions if so please provide details
-
Meter location
-
Has the building been modified or extended since construction to create the built over service or is it as built
-
How many primary meters are there in the building?
-
Service material (if service head adaptor visible class as PE)
-
Diameter
Assessment Checklist
-
Does the built over pipe operate at a pressure greater than 75mbar
-
Is the pipe diameter greater than 32mm?
-
Has the pipe got a steel tail with any of the exposed steel pipe going in to the ground
-
Does any of the above ground service pipe run in an unventilated void
-
Is any of the above ground service pipe unsleeved should it pass through a cavity wall
-
Has any of the exposed service pipe or sleeving been damaged?
-
Have the building works created a contravention of the gas safety (installation and Use) Regulations with regard to the position and operation of the ECV or access to the meter
-
If answer to any of the above are yes then class as high risk. If all answers are no then class as low risk
-
Photos
-
Comments
-
Has any other significant risk been identified on site