Title Page

  • Valve data capture

  • Surveyor name:

  • Contact number

  • Address
  • Number of supply pipes

  • Is the valve box visible

  • Is remedial work required

  • Is supply pipe digitised correctly (if no please provide drawing)

  • Has he remedial work been completed by you? (Use the codes below to indicate work undertaken)

  • If no, what remedial work is required ( see codes below)

  • Are opening notices required to carry out the remedial?

  • Valve Grid Co-ordinates

  • Photo of valves

  • Codes:

    FV= Fit new valve (where valve cannot be located)
    CVS= Clear Valve Stem (where access to valve stem blocked)
    RVC= Replace Valve Cover (missing or broken)
    FVC= Free Valve Cover (where cover will not open)
    EVC= Excavate to locate buried valve cover and raise chamber/cover

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.