ROADS / LANDINGS
-
Do roads, water tables, or culverts require maintenance by Rayonier, Contractor or Purchaser?
-
Have all machinery parts, oil filters, grease cartridges, waste oil, paint cans, ropes, drums and rubbish etc been removed from the site?
-
Has corduroy been lifted and stacked?
-
Has logging waste been managed as per harvest plan?
-
Is landing drainage sufficient?
WATERWAYS / INDIGENOUS VEGETATION
-
Has all slash been removed from significant waterways marked on harvest plan?
-
Is there any evidence of uncontrolled crossing of waterways by machinery?
-
Have all temporary crossings been removed?
-
Has riparian vegetation been excessively damaged?
-
Is there excessive damage to waterway banks?
-
Have covenanted and / or designated sensitive areas been unnecessarily damaged?
SOIL DISTURBANCE
-
Is there any evidence of parallel / excessive tracking or unacceptable mid-slope tracking?
-
Is there any evidence of earthworks not covered in pre-harvest meeting or harvest plan?
-
Have track cutouts been installed as required?
-
Has slash been used on tracks to trap sediment and reduce runoff and compaction?
-
Is there any evidence of excessive gouging along haul lines?
-
Has the overall level of soil disturbance been kept to a minimum?
GENERAL
-
Is there any merchantable volume on the cutover?
-
Is there any merchantable volume on the landing (including corduroy)?
-
Have all exotic / crop trees in the sale area been felled? (If NO then mark location of any remaining trees on map)
-
Are there any standing trees that could be a hazard to aerial spraying operations? (If YES then mark on map and pass to Tree Crop rep.)
-
Have any trees outside the sale area been felled?
-
Has any adjacent stand been affected (excluding exceptions noted in pre-harvest meeting)?
-
Is the average stump height acceptable (other than tie backs)?
-
Have slovens been kept to a minimum?
-
Have all fences etc been left in the agreed state?
-
Have all Rayonier signs been replaced?
-
Are there any new significant site hazards to be added to Rayonier's hazard register?
-
Are there any new waste wood issues that need urgent attention (stabilising / burning / recovery for processing)?
-
Have there been any fuel / oil spills requiring clean-up?
ACTIONS REQUIRED
-