Title Page
-
Conducted on
-
Prepared by
-
Forest
-
Crew / Sale Area / Road name
-
Forest
-
Harvest Contractor and Crew
-
Start Date
-
Expected End Date
SAFETY
-
A copy of the Health and Safety ACoP and Rayonier's Critical Rules are on site
-
Details of known Significant Hazards in the vicinity of the activity area have been supplied to the Contractor
-
The requirement that that Contractor will undertake a Hazard ID prior to work commencing is understood
-
Fire equipment requirements discussed
-
Contractor has completed and supplied OSH with the Notification of Hazardous Work form and provided and copy to Rayonier
-
Harvest map/plan showing operational work area along with Latitude & Longitude coordinates for emergency evacuation has been supplied
-
System to determine breaker-out Safe Retreat Position discussed and agreed (active documented monitoring required)
-
Safety incident report requirements are understood (Serious Harm - verbally within 4 hours. Other accidents involving harm - verbally within 24 hours with written report and investigation within 5 days. All other incidents - written report within 5 days)
-
Contractor has agreed that work can be safely conducted on the site
-
There is a plan to manage hazardous trees near the landing/access road
-
Traffic Control and/or Powerlines permits are required
ACCESS
-
Keys and gates discussed
-
Specific cartage or hours of operation restrictions have been discussed (eg: any route / bridge / hours of operation restrictions)
-
Neighbouring landowner issues / requirements have been discussed. Boundary fence checked and condition recorded
HARVESTING PRACTICE
-
The following items have been identified and discussed
- Location of Harvest boundaries
- Hauler tie-off locations outside Harvest boundaries
- Adjacent stands
-
Corduroy use and post harvest lifting / stacking requirements are understood
-
Requirements relating to any log and machinery movement over roads are understood
-
Harvesting equipment / system requirements have been discussed
-
Agreed maximum stocks (loads)
-
Agreed maximum sorts
ROAD AND LANDING MAINTENANCE
-
Landing maintenance / cleanup requirements have been specified and issues noted (cut-outs off skids, water tables, slash management, drainage, rubbish etc)
SOIL DISTURBANCE
-
Tracking requirements have been discussed and issues noted
-
Cut-outs, sediment traps and coverage of bare earth using slash requirements discussed
-
Backline tracks - identify specific areas on map too steep for mitigation by Engineering
-
Landing and road construction restrictions have been specified and issues noted (where applicable)
ENVIRONMENTAL
-
Resource Consent or permitted activity conditions have been provided and discussed (if applicable)
-
Location and type of waterway crossings have been identified and discussed
-
Relevant Rayonier Matariki Environmental Standards have been discussed and understood
-
Harvest Plan has been read, discussed and understood
-
Contractor is aware of their responsibility to remove slash from identified waterways
-
Fuel storage discussed (ACoP Section 9)
-
Adverse weather stoppages and alternative options have been discussed
-
Location and protection of riparian protection zones, significant waterways, covenanted areas, cultural/historic sites or any other high-value site has been discussed, and documented.
-
Post Harvest (cutover) check criteria and any requirement for an interim inspection is understood by the Contractor
-
Environmental incident reporting requirements including Resource Consent non-conformance are understood (within 24 hours verbally, 5 working days in writing)
-
Will mobilisation of accumulated slash on landings pose any post harvest risk? If "Yes" document how this risk will be minimised (eg: contractor to pull up slash, identification of 'no slash' areas / suitable areas for slash disposal)
-
Comments
-
Waste Management Diagrams
-
ACTION REQUIRED - BY WHOM - BY WHEN
-
The above matters have been discussed, understood and agreed by all parties
-
Signed on behalf of Contractor
-
Date of Contractor signing
-
Signed on behalf of Rayonier
-
Date of Rayonier signing
-
Other persons present at Pre-Harvest Meeting