Information

  • Document No.

  • Audit Title

  • Investigation Number

  • Development Name

  • Stage Number

  • Prepared by

  • Conducted on

  • Location
  • Stakeholders Present

General

  • Audit fees

  • Operational Works approvals in place

  • Areas to be cleared

  • Location of stockpiles

  • Siltation control measures proposed

  • Dust control measures proposed

  • Noise control measures proposed

  • Starting and finishing times

  • Method of vegetation disposal

  • Demolition and disposal of structures

  • Pit burning permit and location of pit

  • Permit issue required

  • Maintenance periods

  • All conditions of approval addressed in the approved drawings

  • Haul routes for materials export/import

  • Local residents informed of proposed start date

  • Parks and landscaping to be supervised by the DCOs

Roadworks

  • Retaining walls proposed

  • Roadworks trench and allotment fill testing requirements

  • Footpath profile

  • Concrete strip footpath

  • Bikeways

  • Pram ramps

  • Traffic control devices

  • Side drain

  • Noise attenuation works

Stormwater Drainage

  • Overland flow required

  • Underground drainage pipe diameters and locations

  • Manhole sizes and depths

  • Gullies

  • Field inlets

  • Headwalls type, location, and ESC

  • Lawful point of discharge

  • Culverts

  • Roofwater drainage

  • Retention basins

  • Gross pollutant traps

  • Pipe survey required

  • Roofwater to be picked up from upstream properties

Sewer

Water

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.