Information
-
Document No.
-
Audit Title
-
Personnel
-
Client / Site
-
Prepared by
-
Location
-
Conducted on
-
Appliances
Appliance
-
Type
-
Make
-
Model
-
Fault Reported
Work Preparation & Customer Care
-
Gas Safe card and ACS elements correct for work to be carried out.
-
Reference material (Manufacturers Instructions) / Technical bulletins available.
-
Visual / written risk assessment completed and recorded.
-
Customer Liaison
-
Customer questioned on appliance / system performance / problems
-
Customer care / work area preparation completed
Appliance / Ancillary Plant / Systems Checks
-
Appliance Installed to manufacturers instructions
-
Gas pipework size, support, construction, route correct
-
Pressure relief pipework / termination correct
-
Condensate pipework / termination correct
-
Flue size construction route termination and support visually examined and correct
-
Ventilation size and route checked and correct
-
Ancillary Plant installed correctly.
-
Systems configured correctly.
Electrical Tests
-
Electrical tests identified & completed correctly
-
Electrical isolation check completed correctly
-
Fuse rating checked and appropriate
Appliance / System fault diagnosis & repair.
-
Appliance / System controls fault diagnosis flow charts in manufacturers instructions followed
-
Fault diagnosis procedure followed logically and cause of fault identified.
-
Rectification work carried out
-
Appliance / associated controls operating correctly
-
Operating pressure and / or gas rate checked
-
Safety devices operation checked
-
Flame picture correct
-
Combustion analysis completed
-
Flue flow continuity check completed correctly
-
Spillage / Case seal tests completed correctly
-
Final tightness test completed correctly where required
-
All disturbed joints tested
Safe Working Practices
-
Safe working practices employed
-
Electrical equipment safety and calibration checks carried out.
Completion
-
Customer instructed in use and instructions left / controls reset
-
Documentation completed correctly
-
Underpinning Knowledge
Question
-
Question
-
Response
Signatures
-
Auditor
-
Operative