Information

  • Property Address:

  • Contractors Name:

  • Contract #:

  • Prepared by Site Manager:

Mark each item with a tick if satisfactory, if not satisfactory do not tick, note defect or any comment below.

  • Room dimensions/layout correct (+/- 10mm)

  • Comments

  • Walls straight & plumb (+/- 4mm from vertical over 2.0m up to 5mm max)

  • Comments

  • Rooms square

  • Comments

  • Bulkheads level & installed (+/- 4mm over 2.0m)

  • Comments

  • Top wall plates level (+/- 4mm over 2.0m up to max. 10mm over room)

  • Comments

  • Bottom and wall plates secure, straight & level (+/- 4mm over 2.0m)

  • Comments

  • Studs placed under truss point loads (packers under girder truss & point loads)

  • Comments

  • Wall junctions fixed with 200mm blocking at 800mm cuts

  • Comments

  • Bracing installed and secured in accordance with engineers details

  • Comments

  • Window / door frames secure & level with packers installed

  • Comments

  • Flashings on all sides of timber windows

  • Comments

  • Trusses plumb / straight +/- 10mm from vertical over 500mm (max 25mm out of plumb)

  • Comments

  • Truss connections meeting accurately & flush to bottom chords

  • Comments

  • All creepers installed flush to bottom chords

  • Comments

  • Trimmers placed at direction change in roof trusses

  • Comments

  • Man hole trimmers in place

  • Comments

  • Squareness of columns with no twist and plumb

  • Comments

  • Door openings correct width / height

  • Comments

  • Joist installed with manufactures detail with blocking fitted correctly. Voids clear, plumbing penetrations clear of joist

  • Comments

  • Sheet flooring screwed at 200mm ctrs & 150mm at butt joints

  • Comments

  • Stairs openings as per plan

  • Comments

  • Windows and external door frames are installed as per manufactures specification and architectural

  • Comments

  • Timber windows have been flashed

  • Comments

  • Protective shields to nominated windows (on 2 storey dwellings only) are intact & in place

  • Comments

  • House is swept out and ready for the following trades

  • Comments

  • Installation of temporary handrail/platform to stairwell or any other voids to the first floor with buildsafe

  • Comments

  • Off cuts / debris placed in one pile besides bin

  • Comments

  • Trusses strengthened for A/C - heating

  • Shower niches in place if applicable

  • Frame overhang to garage step down / slab edge

  • Cavity sliders in position / plumb

  • Frame tie down complete

  • Ceiling heights as per plan

  • Garage beam temporally supported

  • Girder trusses supported on HWD top plate

  • Outriggers strapped

  • Eaves overhang are per plan

  • Valleys boards fully supported

  • Bi-fold door installed correctly

  • External door units fully supported

  • Support wall and noggins for box gutters

Score this contractor

  • 1 - unacceptable
    2 - marginal pass
    3 - meets expectation
    4 - exceeds expectation

  • Quality

  • Time

  • WH&S

  • Site Manager :

  • Date :

  • Construction Manager :

  • Date :

Re inspection All defects have been rectified :

  • Site Manager :

  • Date :

  • Construction Manager :

  • Date :

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.