Title Page

  • Site conducted, Village

  • Conducted on

  • Unit number

  • Prepared by

Buri Waterproofing ITP

  • Area/ room inspected

  • Substrate inspected prior to sealing, clear and clean of dust, surface flat

  • puddle flanges fitted correctly

  • Wall linings correctly installed

  • water bars correctly fitted to doorway/ shower recess

  • Correct curing period between coats

  • 36 hour flood test performed

  • Flood test discharge inspection performed

  • Lend lease representative present for discharge inspection

  • Correct falls to screed

  • Correct curing times allowed prior to screed waterproofing

  • Additonal Room Inspection
  • Area/ room inspected

  • Substrate inspected prior to sealing, clear and clean of dust, surface flat

  • puddle flanges fitted correctly

  • Wall linings correctly installed

  • water bars correctly fitted to doorway/ shower recess

  • Correct curing period between coats

  • 36 hour flood test performed

  • Flood test discharge inspection performed

  • Lend lease representative present for discharge inspection

  • Correct falls to screed

  • Correct curing times allowed prior to screed waterproofing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.