Title Page
-
Site
-
Date
-
Inspection by
-
Location
-
Reason for visit
Site Entrance Checks
Site Entrance
-
Entrance is signed
- Yes
- No
-
Signage is free from damage
- Yes
- No
Road
-
Public road free from mud/debris/water runoff from site
- Yes
- No
-
Site Entrance road free from mud/debris/water runoff from site
- Yes
- No
-
Site Speed Limit Signed
-
Site Traffic Routes Signed
Staff/Visitor Car Park
-
Site PPE clearly signed
- Yes
- No
-
Safety signage in place
- Yes
- No
-
Site reception clearly signed
- Yes
- No
-
Fire Muster point clearly signed
Site Reception
-
Daily site register completed by all persons on site
-
Site induction book avaible and in use
-
Current Health and Safety Spillage Response Locations plan displayed
-
Health & Safety policy displayed
-
Environmental policy displayed
-
Resource Efficiency policy displayed
-
Employers Liability policy displayed
-
Public Liability policy displayed
-
F10 Notice clearly displayed
-
Plant checklists completed/up to date
-
Toolbox talk file avaible/up to date
Site Cabin/Welfare
-
Food preparation area clean
-
Soap or other suitable means of cleaning provided
-
Supply of clean hot and cold running water
-
Supply of towels or suitable means of drying
-
Supply of drinking water (from mains or stored)
-
Toilet facilities clean (flushing toilets and running water)
Working Area
Plant
-
Any plant stood down (if so, why)
- Yes
- No
-
Any Hire plant on site
- Yes
- No
-
Any plant on idle (if so, why)
- Yes
- No
-
All plant correctly operating
People
-
All staff wearing correct PPE
-
All visitors wearing correct PPE
-
Are vehicles and pedestrians clearly seperated
Technical
-
Benching structure complaint with quarrry regulations
-
Rock traps in place as per quarry regulations
-
Plant access roads/tipping points bunded for safety edge protection
-
Is dust sufficiently suppressed in the working area
-
Working area free from contamination sources (waste/lime)
-
Warning and Safety signage is clearly visable
-
Working area is free of obstructions and water
-
Leachate contained within management structure
-
Stockpiles clearly seperated for quantifying
-
Waste all stored within containment area
Survey
-
All boundaries appropriately demarked
-
Working area clearly demarked (if applicable)
-
All waste imports within design boundary
-
Survey benchmarks intact
-
Design heights clearly demarked on site
-
Surface water drains clear and levels flowing in the appropriate direction