Information
-
Document No.
-
Project No.
-
Project Name
-
Site Details
-
Conducted on
-
Prepared by
-
Drawings
MH Inspection
-
MH's
Checked MH
MH Checked
-
MH No.
-
A. Distance from cover to top rung 600mm maximum.
Tap to enter information
-
Reason for NC:
-
B. Class D cover in road reserves. Class B in lots and reserves.
Tap to enter information
-
Reason for NC:
-
C. Bolt down cover provided if required.
Tap to enter information
-
Reason for NC:
-
D. Cover level with surrounding surface.
Tap to enter information
-
Reason for NC:
-
E. Internal finish to MH good. Channel clean and free flowing. MH joint flush and no seals exposed/hanging. No groundwater seepage.
Tap to enter information
-
Reason for NC:
-
F. Inlet & outlet pipes finished flush will internal wall.
Tap to enter information
-
Reason for NC:
-
Comments.....
-
Photos.....
MS/TMS Inspection
-
MS/TMS
Checked MS/TMS
MS/TMS Checked
-
MS/TMS No.
-
A. Distance from cover to top of screw cap between 100-150mm.
Tap to enter information
-
Reason for NC:
-
B. Class D cover in road reserves. Class B in lots and reserves.
Tap to enter information
-
Reason for NC:
-
C. Cover stable & level with surrounding surface & centered.
Tap to enter information
-
Reason for NC:
-
D. Shroud central, not damaged, no gap under cover.
Tap to enter information
-
Reason for NC:
-
Comments.....
-
Photos.....
Property Connections
-
Property Connections
Checked Property Connection
Property Connection Checked
-
Property Connection Location?
-
A. Tie distance confirmed.
Tap to enter information
-
Reason for NC:
-
B. Marker peg and tape installed.
Tap to enter information
-
Reason for NC:
-
Comments.....
-
Photos.....
General Observations
Trenches & Reinstatement
-
Trenches filled, level & reinstated satisfactorily?
Tap to enter information
-
Reason for NC:
-
Photos:
Site Demobilisation
-
Contractor has fully demobilised from site?
Tap to enter information
-
Reason for NC:
-
Photos:
Site Cleanup
-
Site is clean?
Tap to enter information
-
Reason for NC:
-
Photos:
Asset Commissioning
-
Sewermains have passed compliance testing including flushing and ovality?
Tap to enter information
-
Reason for NC:
Abandoned Assets
-
Abandoned assets have been left as noted on the drawings?
Tap to enter information
-
Reason for NC:
-
Photos:
Sewermain is Operational
-
All works have been finalised and all temporary plugs have been removed?
Tap to enter information
-
Reason for NC:
Other Observations
-
Other Observations
Observation
Other Site Observation
-
Comments.....
-
Photos.....