Information

  • Document No.

  • Project No.

  • Project Name

  • Site Details

  • Conducted on

  • Prepared by

  • Drawings

MH Inspection

  • MH's

  • Checked MH

MH Checked

  • MH No.

  • A. Distance from cover to top rung 600mm maximum.

  • Tap to enter information
  • Reason for NC:

  • B. Class D cover in road reserves. Class B in lots and reserves.

  • Tap to enter information
  • Reason for NC:

  • C. Bolt down cover provided if required.

  • Tap to enter information
  • Reason for NC:

  • D. Cover level with surrounding surface.

  • Tap to enter information
  • Reason for NC:

  • E. Internal finish to MH good. Channel clean and free flowing. MH joint flush and no seals exposed/hanging. No groundwater seepage.

  • Tap to enter information
  • Reason for NC:

  • F. Inlet & outlet pipes finished flush will internal wall.

  • Tap to enter information
  • Reason for NC:

  • Comments.....

  • Photos.....

MS/TMS Inspection

  • MS/TMS

  • Checked MS/TMS

MS/TMS Checked

  • MS/TMS No.

  • A. Distance from cover to top of screw cap between 100-150mm.

  • Tap to enter information
  • Reason for NC:

  • B. Class D cover in road reserves. Class B in lots and reserves.

  • Tap to enter information
  • Reason for NC:

  • C. Cover stable & level with surrounding surface & centered.

  • Tap to enter information
  • Reason for NC:

  • D. Shroud central, not damaged, no gap under cover.

  • Tap to enter information
  • Reason for NC:

  • Comments.....

  • Photos.....

Property Connections

  • Property Connections

  • Checked Property Connection

Property Connection Checked

  • Property Connection Location?

  • A. Tie distance confirmed.

  • Tap to enter information
  • Reason for NC:

  • B. Marker peg and tape installed.

  • Tap to enter information
  • Reason for NC:

  • Comments.....

  • Photos.....

General Observations

Trenches & Reinstatement

  • Trenches filled, level & reinstated satisfactorily?

  • Tap to enter information
  • Reason for NC:

  • Photos:

Site Demobilisation

  • Contractor has fully demobilised from site?

  • Tap to enter information
  • Reason for NC:

  • Photos:

Site Cleanup

  • Site is clean?

  • Tap to enter information
  • Reason for NC:

  • Photos:

Asset Commissioning

  • Sewermains have passed compliance testing including flushing and ovality?

  • Tap to enter information
  • Reason for NC:

Abandoned Assets

  • Abandoned assets have been left as noted on the drawings?

  • Tap to enter information
  • Reason for NC:

  • Photos:

Sewermain is Operational

  • All works have been finalised and all temporary plugs have been removed?

  • Tap to enter information
  • Reason for NC:

Other Observations

  • Other Observations

  • Observation

Other Site Observation

  • Comments.....

  • Photos.....

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.