Information
-
Document No.
-
Project No.
-
Project Name
-
Site Details
-
Conducted on
-
Prepared by
-
Drawings
-
Date for end of maintenance period
Valves
-
Valves
Checked Valve
Valve Checked
-
Valve location?
-
A. Depth from cover to top of spindle to be between 100-350mm?
Tap to enter information
-
Reason for NC:
-
B. Shroud central, not damaged, no gap under cover?
Tap to enter information
-
Reason for NC:
-
C. Cover level with surrounding surface & centered?
Tap to enter information
-
Reason for NC:
-
D. Markers installed if required?
Tap to enter information
-
Reason for NC:
-
E. Is 3rd party damage or works likely to be the cause of any issues?
Tap to enter information
-
Specific Comments:
-
Comments.....
-
Photos.....
Fire Plugs
-
Fire Plugs
Checked Fire Plug
Fire Plug Checked
-
Fire plug location?
-
A. Cover to top of lugs 100-200mm?
Tap to enter information
-
Reason for NC:
-
B. Shroud central, not damaged, no gap under cover?
Tap to enter information
-
Reason for NC:
-
C. Cover level with surrounding surface & centered?
Tap to enter information
-
Reason for NC:
-
D. Road reflective marker installed?
Tap to enter information
-
Reason for NC:
-
E. Marker post installed, height & vertical ok?
Tap to enter information
-
Reason for NC:
-
F. Is 3rd party damage or works likely to be the cause of any issues?
Tap to enter information
-
Specific Comments:
-
Comments.....
-
Photos.....
Trench Settlement
-
Trench Settlement Observed?
Tap to enter information
-
Trench Settlement
Trench Settlement Observation
Trench Settlement Observation
-
Observation Location?
-
Specific Comments.....
-
Photos.....
-
General Comments.....
General Observations
Trench Reinstatement
-
Trench reinstatement is satisfactory?
Tap to enter information
-
Reason for NC:
-
Photos:
Site cleanup & demobilisation
-
Site cleanup & demobilisation is complete?
Tap to enter information
-
Reason for NC:
-
Photos:
Other Observations
-
Other Observations
Observation
Other Site Observation
-
Comments.....
-
Photos.....