Title Page
-
Conducted on
-
Prepared by
-
Location
-
Time onsite
-
Time offsite
-
Lead engineer
-
Engineers onsite
Containment
-
Have you installed any containment?
-
What containment has been installed and where?
-
Please insert pictures of any containment installed.
Fibre install
-
Have you installed any Primary route fibre?
-
Please detail any primary route fibre that has been installed and indicate what approximate percentage of each particular route is installed.
-
Have the primary route fibres installed been dressed?
-
Have you installed "Fibre optic warning" labels ?
-
Have you installed any secondary route fibre?
-
Please detail any secondary route fibre that has been installed and indicate what approximate percentage of each particular route is installed.
-
Have the secondary route fibres installed been dressed?
-
Have you installed "Fibre optic warning" labels ?
Fibre termination
-
Have you terminated any fibre?
-
Please detail any terminations, note which fibre route, which PER and the percentage of the fibre terminated.
-
Please attached photos of fibre terminations.
Fibre testing
-
Have you tested any fibres?
-
Please detail any fibre testing completed.
-
Have you uploaded/sync'd the tester?
Sign off
-
Is there anything you need to let Operations know?
-
Do you need any information from Operations?
-
Do you require any materials or plant?
-
Has all waste been removed from site and all Comm's rooms left in a tidy state?
-
Site sign off - The above work has taken place and the site has been left in an acceptable condition.
-
NB - completion of this sign off is mandatory and must be completed ON SITE and submitted to Connect IP
Appendix
-
Please add any additional photos of works completed.
-
Please detail any penetrations made and show before and after firestopping photos
-
Show before and after firestopping photos here