Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Due: 100,000Kms or 6 Months
Trailer
-
Fleet number
-
Hubometer
Records
-
Record the date and odometer reading in maintenance record
-
Change service board
-
Check for type of service due
-
Check for repairs due
Item
-
Check condition and retention of all wiring
-
Check condition and retention of all air lines
-
Lubricant curtain rollers and gates
-
Check all frame work for cracks and broken welds
-
Check decks, ramps and locking devices for wear, damage and cracks
-
Check chassis subframe and cross member for cracks
-
Check brake boosters mounting brackets
-
Inflate air bags, check for leaks, check mountings and bolts
-
Check ride height setting and operating rod end connectors
-
Drain air tanks report any oil present in system
-
Check king pin for security and wear (using king pin go no go gauge)
-
Tension all 'U' bolts, pivot bolts, shockies, air bag bolts and king pin bolts
-
Adjust turn table
-
Check mezzanine floor brackets for cracks
Toolbox
-
Chains
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Binders
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Straps
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Ratchet
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
-
Gate ropes
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Twist lock spacers
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Alloy cheeta
-
Bent solid bar
-
Straight solid bar
Workshop
-
Extras performed and comments
-
Photo reports
-
Sign
-
Sign