Title Page

  • Cabinet Inspected

  • Conducted on

  • Prepared by

  • Location

Interior

  • Rectifier Properly Installed & Configured

  • Fuses Installed w/ spares in place

  • TOR Switch (7316) Properly Installed & Configured

  • 4530 Switches Properly Installed & Configured

  • Traffic Verified on 4530's with Mikrotik

  • Parking Lots Properly Installed

  • All Pigtails Neat

  • Power Cables Properly Installed

  • Equipment Properly Grounded

  • DAC Cables & SFP's Properly Installed

  • Fiber Entry & Slack Storage Neat

  • Batteries properly installed & charging

Exterior

  • Cabinet Exterior Front (Tech Entrance)

  • Cabinet Exterior Side (Fiber Entry)

  • Cabinet Exterior Back (Power Meter)

  • Cabinet Exterior Side (No Entry)

  • Power meter

  • AC Unit

  • Concrete Base

  • Riser at Pole

  • Surrounding Area Clean

  • Properly Secured with Locks in Place

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.