Title Page
-
Conducted on
-
Engineer name and Site ID
-
Location
-
Scope of Works
- 5g DSS
- NTQ
- TEF Tech Add
- London Unwind
- Metropolis 5G
- SW NSN Swap
- SW 5G
- Other
-
Cabinet Type
- Lancaster
- Vulcan
- RBS6102
- RBS6201
- RBS6202
- Hybrid
- CSC
- Other
Self Audit
-
Pre Start Photos taken?
-
Any Legacy Issues to Report?
-
Was a Patrol Fault raised or required?
-
Site Clearance Required?
-
External Alarms tested and uploaded to NEMO?
-
Has the Electrical Testing and a Certification been completed?
-
Correct Breaker Rating as per DD?
-
Correct number of rectifers as per DD?
-
Correct design and location of Antenna installed?
-
Labelling Completed (optical/tx/power/feeders)?
-
Ducting/Entry Points Sealed?
-
Cabinet Installation as per SID?
-
Hop Information been captured by using SDE or Equivalent App (NOT Manual) ?
-
Has the Bitumen been added to the Cabinet Plinth for Lancaster/Vulcan/AC Upstand?
-
Scope of works completed?
-
What works are still outstanding?
-
Was QARA Completed?
-
Revisit required?
-
All Mountings and Connections set to the correct torque settings using calibrated wrench? (Please include photo of wrench and calibration sheet).