Information

  • Document No:

  • Conducted on:

  • Prepared by:

  • Personnel Involved in the working party:

General Overview:

  • Project and Location:

  • Supervisor in charge of the works at the time of this inspection:

  • Select site weather conditions at time of this inspection (select all that apply)

  • Current activities being undertaken on site:

Inspection Questions:

First Aid Provisions:

  • Are first aid Provisions to be reviewed in this Inspection?

  • Are First aid provisions adequate for the task undertaken ?

  • Are employees aware of the location of first aid provisions?

  • Are there sufficient First aiders for the work being undertaken?

  • Are First aider contact details clearly displayed on site safety boards?

Fire Prevention & Emergency:

  • Are fire and emergency procedures to be reviewed in this Inspection?

  • Has the Evacuation plan been clearly displayed and is it understood by all employees?

  • Can Exit doors easily be opened from inside?

  • Are Exits clear of obstructions?

  • Is Emergency exit lighting operable?

  • Are Extinguishers in place, clearly marked for type of fire and have a valid date ?

  • Are Extinguishers clear of obstructions?

Site Security:

  • Is site security to be reviewed in this Inspection?

  • Are site entry and exit points clearly designated?

  • Have Visitors signed onto site using the appropriate log ?

Personal Protective Equipment (PPE):

  • Is Personal Protective Equipment to be reviewed in this Inspection?

  • Is head protection worn correctly and where required?

  • Is eye protection worn where required?

  • Are the correct forms of eye protection worn for tasks being completed?

  • Is hearing protection worn in designated areas?

  • Are the correct forms of hand protection worn for manual tasks

  • Is respiratory protection worn where dust, mist or fumes are present?

  • Is footwear in good condition and of correct type?<br>

  • Is High visibility clothing suitable for the working location ?

  • Are safety harnesses worn correctly where required ?<br>

  • Is additional PPE used where required (As per approved RAMS and POWRAs)?

Housekeeping:

  • Is site housekeeping to be reviewed in this Inspection?

Work Areas

  • Are Work areas to be inspected in this audit?

  • Are Work locations clear of rubbish and debris?

  • Are tools and Materials not in use put away?

  • Are waste materials generated being stored and disposed of in a suitable manner ?

  • Are access and egress routes free from obstructions ?

Trip and Fall Safety:

  • Trip and fall safety to be reviewed in this Inspection?

  • Are walkways adequately and clearly marked?

  • Are stairs and risers kept clear?

  • Are footpaths in good condition?

  • Are appropriate measures in place to prevent falls? ie. barriers (preferred) or harnesses?

  • Are all floor openings fully barricaded or are protected with a secured cover ?

Mobile Towers (PASMA):

  • Are Mobile towers to be reviewed in this Inspection?

  • Are Mobile towers inspected by qualified and trained personnel before use?

  • Are Mobile towers accessible and clear of unstable objects and trip hazards?

  • Are guard rails installed on mobile towers correctly?

  • Are Mobile tower footings stable, secure and free of unstable propping objects (barrels, boxes, loose brick or concrete blocks etc)?

  • Are Mobile towers being used in a safe and appropriate manner?

Manual handling:

  • Are Manual handling Tasks to be reviewed in this Inspection?

  • Have Manual handling tasks on site been identified?

  • Have Manual handling Risk Assessments for these activities been completed?

  • Are suitable controls in place for task individual load and environment (T.I.L.E)?

  • Are workers undertaking Manual handling tasks in a safe manner?

Hand and Power Tools:

  • Are Hand and power tools to be reviewed in this Inspection?

  • Are all tool guards and/or handles in place as per manufactures recommendations?

  • Are all power tools in good condition and free from defects?

  • Are defective pieces of equipment and tools removed from service?

  • Are tools stored correctly and in the right place when not in use?

  • Are employees using the proper tool for the task and are they using it as per manufactures recommendations ?

  • Where applicable are dust collectors and exhausts provided on tools that produce large amounts of dust?

Plant and Machinery:

  • Is Plant and Machinery to be reviewed in this Inspection?

  • Have risk assessments been completed for plant and machinery where appropriate?

  • If required, are relevant pre-start inspections being completed on plant and machinery?

  • Is plant and machinery kept clean?

  • Are guards in good condition?

  • Are drip pans on floor to prevent spillage? (where appropriate)

  • Are noise levels generated by the works adequately controlled?

  • Is there sufficient room to use the plant and machinery safely?

  • Are machine, equipment and plant operators trained/inducted to be competent in safe and correct operation?

  • Are plant or machine operators using the equipment in a safe manner?

Ladders:

  • Are Ladders to be reviewed in this Inspection?

  • Are all ladders of the correct strength for the task to be undertaken? (Non-Household rated, check label.)

  • Are ladders in good condition and been subject to a regular inspection?

  • If used for electrical work or in electrical areas are ladders non conductive?

  • Are ladders being used according to the working at height regulations?

  • Are ladders only used where other means of access have been deemed unsuitable?

  • Have all members the working party undertaken the safe use of ladders training module?

Electrical Safety:

  • Is Electrical safety to be reviewed in this Inspection?

  • If 240v equipment is to be used, has it been assessed within a Point of Work Risk Assessment (POWRA)?

  • Has portable equipment been tested and tagged (PAT)?

  • Are walkways, access and egress routes fee from trailing leads?

  • Are leads being used free from damage and are they free from being over strained?

  • When working on Electrical infrastructure, have the necessary permits been applied for and are they in place?

  • Has existing infrastructure been considered when undertaking the Pre-Works briefing and POWRAs?

  • Has the limitation of the SSOW been briefed to the working party during the Pre-works briefing?

  • Have sufficient member's of the working party been adequately trained for switch-room access such as (ESR1/ESR2/UKPNs)?

Hazardous Substances:

  • Is the use of Hazardous Substances to be reviewed in this Inspection?

  • Has a COSHH risk assessment been completed for hazardous substances, is it available and has it been briefed at the point of works?

  • Are all COSHH containers labelled correctly?

  • Are unused substances stored and are they being disposed of correctly?

  • Where applicable is adequate ventilation provided?

  • Are sufficient eye wash provisions available at the point of works?

  • Are spill kits or other clean up arrangements available?

Confined Spaces:

  • Are Confined space works to be reviewed in this Inspection?

  • Are confined space works covered in the relevant permit for the works being undertaken?

  • Is a confined space emergency plan in place?

  • Has the limitations of the SSOW been briefed to the working party before commencement of works?

  • Are confined spaces being appropriately monitored?

  • Are the indicated risk mitigation measures being appropriately implemented?

  • Are all members of the working party trained to a minimum standard of CS2 (Working and Rescue) and are they on the HAL CS Register?

Incident, Injury & Accident Procedures:

  • Are Incident Procedures to be reviewed in this Inspection?

  • Are all members of the working party aware of the incident escalation procedure?

General Comments:

  • Any further comments or recommendations arising from this inspection?

  • Add any additional relevant photos:

  • Have all required corrective actions been added as Actions to this inspection?

  • Please add any corrective actions to the appropriate questions above before completing this report

Sign Off:

  • Name & Signature:

  • Name & Signature of Supervisor:

  • Date and Time of inspection completion:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.