Title Page

  • Project Title:

  • Substation Number:

  • RAMS Reference:

  • Methodology Reference:

  • LOA Required:

  • LSS Required:

  • LV Permit required:

  • Service clearance permit required:

  • AWA Reference:

  • WAN Reference:

Location of Works - Date and Time:

Location:

  • Substation location:
  • Date:

  • Time:

Assessor:

  • Name of Supervisor in charge:

  • Company:

PC Site set up:

  • Has Fujitsu taken PC Control of the site:

  • Has the Substation log been populated correctly:

  • Has a project specific induction been delivered to all persons at the point of works?

  • Has the Site safety Board been established:

  • Has Suitable work area segregation been established:

Operational and Critical equipment:

  • How many operational isolators have been identified?

  • Have all operational Isolators and critical equipment been segregated:

  • How many CCRs are located in this substation?

  • Are all CCRs in an on state and set to remote? Capture state of all CCRs.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.