Title Page
-
Audit Title
-
Date of assurance:
-
Completed by:
-
Site:
-
Work Description:
-
Was the work well defined (description) in PTW?<br>(Review at least 50% of PTW issues in last 3 months)
-
Was work completed by licensed/authorized person?<br>(In accordance with local/Shell requirements?)
-
Was Job Hazard Analysis (JHA) submitted for the required work?<br>(JHA must identify all critical steps of the activity)
-
Was competent person appointed to apply lock-out tag-out (LOTO) on the affected electrical system?<br>(Verify the license or permit)
-
Was "as built" drawings and diagrams used for the application of permits and identification of isolation points for LOTO?<br>(Review drawings attached to PTW?)
-
Was any test conducted at the working point for stored energy or hazard after LOTO?<br>(Review task sheet and interview the person)
-
Was physical barrier and signage erected to prevent access to affected work area?
-
Were electrical workers equipped with insulated tools including ladder?<br>(Physically examine the tools and equipment)
-
Were electrical workers wearing PPE mentioned in PTW?
-
Are affected parties informed of the plans to apply/remove the LOTO and restore the electrical system?
-
Were PTW closed and all isolation points reinstated for operation?
-
The inspection checklist for electrical work has been verified in accordance with the requirements listed.