Title Page
-
Audit Title
-
Date of assurance
-
Completed by
-
Site
-
Number of PTW reviewed:
-
1. PTW is issued by Authorized PTW Issuers?<br>(Verify the names in PTW issuer authorized list)
-
2. Was the work well defied (description) in PTW?<br>(Review at least 50% PTW issued in the last 3 months)
-
3. Was Job Hazard Analysis (JHA) submitted for the required work?<br>(JHA must identify all critical steps of activity)
-
4. Issued PTW were completed with all the required information.
-
5. Daily site check were completed and signed by issuer and requestor.
-
6. Was required TASK SHEET attached with PTW?<br>(Review at least 50% PTW issued in the last 3 months)
-
7. Was physical barriers and signage erected to prevent access to affected work area?
-
8. Were permit issuer completed visit to work site before signing the permit? <br>(Verify at least 3 months with cross reference or interview)
-
9. Were necessary PPE, required to completed the task mentioned in PTW?
-
10. Were PTW closed and signed after the completion of the work?
-
I have conducted the self-assessment for the issued for the above mentioned site.