Foreman/Subcontractor
-
Operation
-
Select date
-
Tour Participants
Workplan
-
Are the most current Plans/Specs/RFI's/Deficiencies incorporated into the work plan?
-
Is the work plan easy to understand?
-
Has the work plan been communicated to the crew?
-
Is the work plan step by step?
-
Does the work plan include tolerances, hold or witness points?
Survey & Layout
-
Does the operation have survey/layout?
-
Does the survey/layout include associated work?
-
Is the work configured correctly?
-
Is the survey/layout protected from damage?
-
Does the survey and work look right?
Material
-
Are the materials correct?
-
Are the materials free of damage?
-
Are the materials stored properly and per manufacturer's recommendation?
-
Is all construction waste being sorted into proper recycling bins?
Workmanship
-
Is the crew competent?
-
Are the right tools and equipment being used?
-
Are the right means and methods being used?
-
Is the operation finishing work as they go?
-
Is the finished work being protected?
Checklist
-
Is the checklist with the operation?
-
Is the checklist being used?
-
Does the checklist have relevant questions?
-
Does the checklist identify tolerances?
-
Does the checklist identify hold points?
Comments
-
Comments: